ORS 196.825: Criteria for issuance of permit; conditions; consultation with public bodies; hearing; appeal.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
(1) The Director of the Department of State Lands shall issue a permit applied for under ORS 196.815 if the director determines that the project described in the application: (a) Is consistent with the protection, conservation and best use of the water resources of this state as specified in ORS 196.600 to 196.921; and (b) Would not unreasonably interfere with the paramount policy of this state to preserve the use of its waters for navigation, fishing and public recreation. (2) If the director issues a permit applied for under ORS 196.815 to a person that proposes a removal or fill activity for construction or maintenance of a linear facility, and if that person is not a landowner or a person authorized by a landowner to conduct the proposed removal or fill activity on a property, then the person may not conduct removal or fill activity on that property until the person obtains: (a) The landowner’s consent; (b) A right, title or interest with respect to the property that is sufficient to undertake the removal or fill activity; or (c) A court order or judgment authorizing the use of the property. (3) In determining whether to issue a permit, the director shall consider all of the following: (a) The public need for the proposed fill or removal and the social, economic or other public benefits likely to result from the proposed fill or removal. When the applicant for a permit is a public body, the director may accept and rely upon the public body’s findings as to local public need and local public benefit. (b) The economic cost to the public if the proposed fill or removal is not accomplished. (c) The availability of alternatives to the project for which the fill or removal is proposed. (d) The availability of alternative sites for the proposed fill or removal. (e) Whether the proposed fill or removal conforms to sound policies of conservation and would not interfere with public health and safety. (f) Whether the proposed fill or removal is in conformance with existing public uses of the waters and with uses designated for adjacent land in an acknowledged comprehensive plan and land use regulations. (g) Whether the proposed fill or removal is compatible with the acknowledged comprehensive plan and land use regulations for the area where the proposed fill or removal is to take place or can be conditioned on a future local approval to meet this criterion. (h) Whether the proposed fill or removal is for streambank protection. (i) Whether the applicant has provided all practicable mitigation to reduce the adverse effects of the proposed fill or removal in the manner set forth in ORS 196.800. In determining whether the applicant has provided all practicable mitigation, the director shall consider the findings regarding wetlands set forth in ORS 196.668 and whether the proposed mitigation advances the policy objectives for the protection of wetlands set forth in ORS 196.672. (4) The director may issue a permit for a project that results in a substantial fill in an estuary for a nonwater dependent use only if the project is for a public use and would satisfy a public need that outweighs harm to navigation, fishery and recreation and if the proposed fill meets all other criteria contained in ORS 196.600 to 196.921. (5) If the director issues a permit, the director may impose such conditions as the director considers necessary to carry out the purposes of ORS 196.805 and 196.830 and subsection (1) of this section and to provide mitigation for the reasonably expected adverse effects of project development. In formulating such conditions the director may request comment from public bodies, as defined in ORS 174.109, federal agencies and tribal governments affected by the permit. Each permit is valid only for the time specified therein. The director shall impose, as conditions to any permit, general authorization or wetland conservation plan, measures to provide mitigation for the reasonably expected adverse effects of project development. Compensatory mitigation shall be limited to replacement of the functions and values of the impacted water resources of this state. (6)(a) The director may request comment from interested parties and adjacent property owners on any application for a permit. (b) The director shall furnish to any person, upon written request and at the expense of the person who requests the copy, a copy of any application for a permit or authorization under this section or ORS 196.850. (c) For permit applications for a removal or fill activity for construction or maintenance of a linear facility that are deemed complete by the director, the director shall notify by first-class mail, electronic mail or electronic facsimile transmission all landowners whose land is identified in the permit application and all landowners whose land is adjacent to the property of a landowner whose land is identified in the permit application. (7) Any applicant whose application for a permit or authorization has been deemed incomplete or has been denied, or who objects to any of the conditions imposed under this section by the director, may, within 21 days of the denial of the permit or authorization or the imposition of any condition, request a hearing from the director. Thereupon the director shall set the matter down for hearing, which shall be conducted as a contested case in accordance with ORS 183.415 to 183.430, 183.440 to 183.460 and 183.470. After such hearing, the director shall enter an order containing findings of fact and conclusions of law. The order shall rescind, affirm or modify the director’s initial order. Appeals from the director’s final order may be taken to the Court of Appeals in the manner provided by ORS 183.482. (8) Except for a permit issued under the process set forth in ORS 517.952 to 517.989, the director shall: (a) Determine whether an application is complete within 30 days from the date the Department of State Lands receives the application. If the director determines that an application is complete, the director shall distribute the application for comment pursuant to subsection (5) of this section. If the director determines that the application is not complete, the director shall notify the applicant in writing that the application is deficient and explain, in the same notice, the deficiencies. (b) Issue a permit decision within 90 days after the date the director determines that the application is complete unless: (A) An extension of time is granted under subsection (10)(b) of this section; (B) The applicant and the director agree to a longer time period; or (C) The director determines that an extension is necessary to coordinate the issuance of a proprietary authorization decision for an ocean renewable energy facility under ORS 274.873 and a removal or fill permit decision. (9) Permits issued under this section shall be in lieu of any permit or authorization that might be required for the same operation under ORS 164.775, 164.785, 468.020, 468.035, 468.045, 468.055, 468.060, 468.110, 468.120, 468B.005 to 468B.030 and 468B.048 to 468B.085, so long as: (a) The operation is that for which the permit or authorization is issued; and (b) The standards for granting the permit or authorization are substantially the same as those established pursuant to ORS 164.775, 164.785, 468.020, 468.035, 468.045, 468.055, 468.110, 468.120, 468B.005 to 468B.030 and 468B.048 to 468B.085 to the extent they affect water quality. (10)(a) Any public body, as defined in ORS 174.109, federal agency or tribal government requested by the director to comment on an application for a permit must submit its comments to the director not more than 30 days after receiving the request for comment. If a public body, federal agency or tribal government fails to comment on the application within 30 days, the director shall assume that the public body, federal agency or tribal government has no objection. (b) The Department of Environmental Quality shall provide comments to the director within 75 days after receiving notice under subsection (5) of this section if the permit action requires certification under the Federal Water Pollution Control Act (P.L. 92-500), as amended. (11) In determining whether to issue a permit, the director may consider only standards and criteria in effect on the date the director receives the completed application. (12) As used in this section: (a) “Applicant” means a landowner, a person authorized by a landowner to conduct a removal or fill activity or a person that proposes a removal or fill activity for construction or maintenance of a linear facility. (b) “Completed application” means a signed permit application form that contains all necessary information for the director to determine whether to issue a permit, including: (A) A map showing the project site with sufficient accuracy to easily locate the removal or fill site; (B) A project plan showing the project site and proposed alterations; (C) The fee required under ORS 196.815; (D) Any changes that may be made to the hydraulic characteristics of waters of this state and a plan to minimize or avoid any adverse effects of those changes; (E) If the project may cause substantial adverse effects on aquatic life or aquatic habitat within this state, documentation of existing conditions and resources and identification of the potential impact if the project is completed; (F) An analysis of alternatives that evaluates practicable methods to minimize and avoid impacts to waters of this state; (G) If the project is to fill or remove material from wetlands, a wetlands mitigation plan; and (H) Any other information that the director deems pertinent and necessary to make an informed decision on whether the application complies with the policy and standards set forth in this section. (c) “Linear facility” includes any railway, highway, road, pipeline, water or sewer line, communication line, overhead or underground electrical transmission or distribution line or similar facility. [Formerly 541.625 and then 196.695; 1991 c.735 §25; 1993 c.741 §18; 1995 c.370 §1; 1995 c.472 §1; 2001 c.460 §2; 2001 c.516 §3; 2003 c.253 §§9,10; 2003 c.738 §§17a,18a; 2007 c.849 §§4,5; 2009 c.342 §2; 2009 c.343 §20; 2011 c.370 §1; 2015 c.386 §13]
Administrative rules citing this section
- OAR 141-083-0800: Purpose and Applicability — implements
- OAR 141-083-0800: Purpose and Applicability — authority
- OAR 141-083-0810: Policies — implements
- OAR 141-083-0810: Policies — authority
- OAR 141-083-0820: Definitions — implements
- OAR 141-083-0820: Definitions — authority
- OAR 141-083-0830: Cable Easement Application Requirements — implements
- OAR 141-083-0830: Cable Easement Application Requirements — authority
- OAR 141-083-0840: Pre-Application and Application Review Process — implements
- OAR 141-083-0840: Pre-Application and Application Review Process — authority
- OAR 141-083-0850: Cable Easement Terms and Conditions — implements
- OAR 141-083-0850: Cable Easement Terms and Conditions — authority
- OAR 141-083-0860: Penalties — implements
- OAR 141-083-0860: Penalties — authority
- OAR 141-083-0870: Reconsideration of Decision — implements
- OAR 141-083-0870: Reconsideration of Decision — authority
- OAR 141-085-0500: General — authority
- OAR 141-085-0506: Policy — authority
- OAR 141-085-0510: Definitions — implements
- OAR 141-085-0515: Removal-Fill Jurisdiction by Type of Water — authority
- OAR 141-085-0520: Removal-Fill Jurisdiction by Volume of Material — implements
- OAR 141-085-0520: Removal-Fill Jurisdiction by Volume of Material — authority
- OAR 141-085-0525: Measuring and Calculating Volume of Removal and Fill — authority
- OAR 141-085-0530: Exemptions for Certain Activities and Structures — authority
- OAR 141-085-0534: Exemptions for Certain Voluntary Habitat Restoration Activities — authority
- OAR 141-085-0545: Fees for Removal-Fill Applications — authority
- OAR 141-085-0550: Application Requirements for Individual Permits — authority
- OAR 141-085-0555: Individual Removal-Fill Permit Application Review Process — authority
- OAR 141-085-0560: Public Review Process for Individual Removal - Fill Permit Applications — implements
- OAR 141-085-0560: Public Review Process for Individual Removal - Fill Permit Applications — authority
- OAR 141-085-0565: Department Determinations and Considerations in Evaluating Individual Permit Applications — implements
- OAR 141-085-0565: Department Determinations and Considerations in Evaluating Individual Permit Applications — authority
- OAR 141-085-0575: Permit Appeals — authority
- OAR 141-085-0580: Discovery in Contested Cases — authority
- OAR 141-085-0585: Permit Conditions, Permit Expiration Dates and Permit Transfer — authority
- OAR 141-085-0590: Renewal and Extension of Individual Removal-Fill Permits — authority
- OAR 141-085-0595: Permit Requirements and Interagency Coordination for Department of Environmental Quality Approved Remedial Action, Corrections Facilities, Solid Waste Land Fills and Energy Facilities — authority
- OAR 141-085-0665: Expedited Process for Industrial or Traded Sector Sites — authority
- OAR 141-085-0676: Emergency Authorizations — authority
- OAR 141-085-0680: Compensatory Mitigation (CM); Applicability and Principal Objectives — authority
- OAR 141-085-0685: Functions and Values Assessment — implements
- OAR 141-085-0685: Functions and Values Assessment — authority
- OAR 141-085-0690: Eligibility Requirements for CM — implements
- OAR 141-085-0690: Eligibility Requirements for CM — authority
- OAR 141-085-0692: Mitigation Accounting — implements
- OAR 141-085-0692: Mitigation Accounting — authority
- OAR 141-085-0694: Special Requirement for CM — implements
- OAR 141-085-0694: Special Requirement for CM — authority
- OAR 141-085-0695: Administrative Protection of CM Sites — authority
- OAR 141-085-0700: Financial Security for CM Sites — authority
- OAR 141-085-0705: Requirements for CM Plans — authority
- OAR 141-085-0710: Monitoring Requirements for CWM — implements
- OAR 141-085-0710: Monitoring Requirements for CWM — authority
- OAR 141-085-0715: Mitigation for Temporary Impacts — authority
- OAR 141-085-0720: Mitigation Banking Purpose, Applicability and Policies — authority
- OAR 141-085-0725: Process for Establishing Mitigation Banks — authority
- OAR 141-085-0730: Establishment of Mitigation Credits — authority
- OAR 141-085-0735: Release, Use and Sale of Mitigation Credits — authority
- OAR 141-085-0740: Authorization for Mitigation Banks — authority
- OAR 141-085-0745: In-Lieu Fee Mitigation — authority
- OAR 141-085-0750: Payments to and Expenditures from the Oregon Removal-Fill Mitigation Fund — authority
- OAR 141-085-0755: Advance Mitigation — authority
- OAR 141-085-0770: Complaints and Investigations — authority
- OAR 141-085-0775: Enforcement Actions and Procedures; Appeals — authority
- OAR 141-085-0780: Revoking or Suspending an Authorization; Allowing Corrective Action — authority
- OAR 141-085-0785: Civil Penalties; Appeals — authority
- OAR 141-086-0100: Duty to Notify of Proposed Activities Within Wetlands — authority
- OAR 141-090-0005: Purpose — implements
- OAR 141-090-0010: Applicability — implements
- OAR 141-090-0020: Definitions — implements
- OAR 141-090-0025: Procedures for Determinations Conducted Entirely by the Department — implements
- OAR 141-090-0030: Technical Requirements — implements
- OAR 141-090-0040: Procedures for Review and Approval of a Wetland Delineation Report Submitted to the Department for a Jurisdictional Determination — implements
- OAR 141-090-0045: Duration, Revision, Expiration and Reissuance of Jurisdictional Determinations — implements
- OAR 141-090-0050: Request for Reconsideration, Contested Case, and Appeal — implements
- OAR 141-090-0055: Effective Date — implements
- OAR 141-093-0141: Transportation-Related Structures - Eligibility Requirements — implements
- OAR 141-093-0141: Transportation-Related Structures - Eligibility Requirements — authority
- OAR 141-093-0250: Maintenance Dredging - Purpose — implements
- OAR 141-093-0255: Maintenance Dredging - Definitions — implements
- OAR 141-093-0260: Maintenance Dredging - Eligibility Requirements — implements
- OAR 141-093-0265: Maintenance Dredging - Specific Application Requirements — implements
- OAR 141-093-0270: Maintenance Dredging - Authorized Activities — implements
- OAR 141-093-0275: Maintenance Dredging - Specific Conditions — implements
- OAR 141-093-0280: Maintenance Dredging - Term and Reporting — implements
- OAR 141-102-0000: Purpose — implements
- OAR 141-102-0010: Policy — implements
- OAR 141-102-0020: Definitions — implements
- OAR 141-102-0030: Designation of Essential Salmon Habitat (ESH) — implements
- OAR 141-102-0040: Revisions to ESH — implements
- OAR 603-095-4000: Purpose and Applicability – Agricultural Drainage Channel Maintenance — implements
This rule cites
- ORS 196.815 — resolved
- ORS 196.600 — resolved
- 196.921 — resolved
- ORS 196.800 — resolved
- ORS 196.668 — resolved
- ORS 196.672 — resolved
- ORS 196.805 — resolved
- 196.830 — resolved
- ORS 174.109 — resolved
- ORS 196.850 — resolved
- ORS 183.415 — resolved
- 183.430 — resolved
- 183.440 — resolved
- 183.460 — resolved
- 183.470 — resolved
- ORS 183.482 — resolved
- ORS 517.952 — resolved
- 517.989 — resolved
- ORS 274.873 — resolved
- ORS 164.775 — resolved
- 164.785 — resolved
- 468.020 — resolved
- 468.035 — resolved
- 468.045 — resolved
- 468.055 — resolved
- 468.060 — resolved
- 468.110 — resolved
- 468.120 — resolved
- 468B.005 — target_record_not_published
- 468B.030 — target_record_not_published
- 468B.048 — target_record_not_published
- 468B.085 — target_record_not_published
Cited by
- ORS 183.457: Representation of persons other than agencies participating in contested case hearings.
- ORS 196.620: Resource values and credits for mitigation banks; use and withdrawal of credits; annual evaluation of system by director.
- ORS 196.643: Payments to comply with permit condition, authorization or resolution of violation; report; rules.
- ORS 196.682: Permits required for removal or fill; conditions on issuance of permit.
- ORS 196.684: Amendment of plans; review of plans by department; review of orders by Land Use Board of Appeals.
- ORS 196.686: Acknowledged estuary management plans; review and approval; hearings; final order.
- ORS 196.692: Rules.
- ORS 196.830: Estuarine resource replacement as condition for fill or removal from estuary; considerations; other permit conditions.
- ORS 196.845: Investigations and surveys.
- ORS 196.855: Noncomplying removal of material or filling as public nuisance.
- ORS 196.860: Enforcement powers of director.
- ORS 196.865: Revocation, suspension or refusal to renew permit.
- ORS 390.835: Highest and best use of waters within scenic waterways; prohibitions; authority of various agencies; water rights; conditions; recreational prospecting; placer mining.
- OAR 137-003-0008: Authorized Representative in Designated Agencies
- OAR 141-085-0768: Advance Aquatic Resource Plans
- OAR 141-090-0045: Duration, Revision, Expiration and Reissuance of Jurisdictional Determinations
- OAR 141-100-0070: Appeals
- OAR 660-004-0022: Reasons Necessary to Justify an Exception Under Goal 2, Part II(c)
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors196.html