ORS 196.830: Estuarine resource replacement as condition for fill or removal from estuary; considerations; other permit conditions.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
(1) As used in this section, “estuarine resource replacement” means the creation, restoration or enhancement of an estuarine area to maintain the functional characteristics and processes of the estuary, such as its natural biological productivity, habitats and species diversity, unique features and water quality. (2) Except as provided in subsection (4) of this section, the Director of the Department of State Lands shall require estuarine resource replacement as a condition of any permit for filling or removal of material from an intertidal or tidal marsh area of an estuary. (3) If the director requires estuarine resource replacement, the director shall consider: (a) The identified adverse impacts of the proposed activity; (b) The availability of areas in which replacement activities could be performed; (c) The provisions of land use plans for the area adjacent to or surrounding the area of the proposed activity; (d) The recommendations of any interested or affected state or local agencies; and (e) The extent of compensating activity inherent in the proposed activity. (4) Notwithstanding any provisions of this chapter and ORS chapters 195, 197 and 197A or the statewide planning goals adopted thereunder to the contrary, the director may: (a) Waive estuarine resource replacement in part for an activity for which replacement would otherwise be required if, after consultation with appropriate state and local agencies the director determines that: (A) There is no alternative manner in which to accomplish the purpose of the project; (B) There is no feasible manner in which estuarine resource replacement could be accomplished; (C) The economic and public need for the project and the economic and public benefits resulting from the project clearly outweigh the potential degradation of the estuary; (D) The project is for a public use; and (E) The project is water dependent or the project is publicly owned and water related; or (b) Waive estuarine resource replacement wholly or in part for an activity for which replacement would otherwise be required if the activity is: (A) Filling for repair and maintenance of existing functional dikes and negligible physical or biological damage to the tidal marsh or intertidal areas of the estuary will result; (B) Riprap to allow protection of an existing bankline with clean, durable erosion resistant material when a need for riprap protection is demonstrated that cannot be met with natural vegetation and no appreciable increase in existing upland will occur; (C) Filling for repair and maintenance of existing roads and negligible physical or biological damage to the tidal marsh or intertidal areas of the estuary will result; (D) Dredging for authorized navigation channels, jetty or navigational aid installation, repair or maintenance conducted by or under contract with the Army Corps of Engineers; (E) Dredging or filling required as part of an estuarine resource restoration or enhancement project agreed to by local, state and federal agencies; or (F) A proposed alteration that would have negligible adverse physical or biological impact on estuarine resources. (5) Nothing in this section is intended to limit the authority of the director to impose conditions on a permit under ORS 196.825. [Formerly 541.626 and then 196.700; 2005 c.22 §136]
Administrative rules citing this section
- OAR 141-083-0800: Purpose and Applicability — implements
- OAR 141-083-0800: Purpose and Applicability — authority
- OAR 141-083-0810: Policies — implements
- OAR 141-083-0810: Policies — authority
- OAR 141-083-0820: Definitions — implements
- OAR 141-083-0820: Definitions — authority
- OAR 141-083-0830: Cable Easement Application Requirements — implements
- OAR 141-083-0830: Cable Easement Application Requirements — authority
- OAR 141-083-0840: Pre-Application and Application Review Process — implements
- OAR 141-083-0840: Pre-Application and Application Review Process — authority
- OAR 141-083-0850: Cable Easement Terms and Conditions — implements
- OAR 141-083-0850: Cable Easement Terms and Conditions — authority
- OAR 141-083-0860: Penalties — implements
- OAR 141-083-0860: Penalties — authority
- OAR 141-083-0870: Reconsideration of Decision — implements
- OAR 141-083-0870: Reconsideration of Decision — authority
- OAR 141-085-0510: Definitions — implements
- OAR 141-085-0520: Removal-Fill Jurisdiction by Volume of Material — implements
- OAR 141-085-0560: Public Review Process for Individual Removal - Fill Permit Applications — implements
- OAR 141-085-0565: Department Determinations and Considerations in Evaluating Individual Permit Applications — implements
- OAR 141-085-0685: Functions and Values Assessment — implements
- OAR 141-085-0690: Eligibility Requirements for CM — implements
- OAR 141-085-0692: Mitigation Accounting — implements
- OAR 141-085-0694: Special Requirement for CM — implements
- OAR 141-085-0710: Monitoring Requirements for CWM — implements
- OAR 141-086-0100: Duty to Notify of Proposed Activities Within Wetlands — authority
- OAR 141-090-0005: Purpose — implements
- OAR 141-090-0010: Applicability — implements
- OAR 141-090-0020: Definitions — implements
- OAR 141-090-0025: Procedures for Determinations Conducted Entirely by the Department — implements
- OAR 141-090-0030: Technical Requirements — implements
- OAR 141-090-0040: Procedures for Review and Approval of a Wetland Delineation Report Submitted to the Department for a Jurisdictional Determination — implements
- OAR 141-090-0045: Duration, Revision, Expiration and Reissuance of Jurisdictional Determinations — implements
- OAR 141-090-0050: Request for Reconsideration, Contested Case, and Appeal — implements
- OAR 141-090-0055: Effective Date — implements
- OAR 141-093-0141: Transportation-Related Structures - Eligibility Requirements — implements
- OAR 141-093-0141: Transportation-Related Structures - Eligibility Requirements — authority
- OAR 141-093-0250: Maintenance Dredging - Purpose — implements
- OAR 141-093-0255: Maintenance Dredging - Definitions — implements
- OAR 141-093-0260: Maintenance Dredging - Eligibility Requirements — implements
- OAR 141-093-0265: Maintenance Dredging - Specific Application Requirements — implements
- OAR 141-093-0270: Maintenance Dredging - Authorized Activities — implements
- OAR 141-093-0275: Maintenance Dredging - Specific Conditions — implements
- OAR 141-093-0280: Maintenance Dredging - Term and Reporting — implements
- OAR 141-102-0000: Purpose — implements
- OAR 141-102-0010: Policy — implements
- OAR 141-102-0020: Definitions — implements
- OAR 141-102-0030: Designation of Essential Salmon Habitat (ESH) — implements
- OAR 141-102-0040: Revisions to ESH — implements
- OAR 603-095-4000: Purpose and Applicability – Agricultural Drainage Channel Maintenance — implements
This rule cites
- ORS 196.825 — resolved
Cited by
- ORS 196.681: Duties of department; standards for approval of plan; conditions for approval; order.
- ORS 196.684: Amendment of plans; review of plans by department; review of orders by Land Use Board of Appeals.
- ORS 196.686: Acknowledged estuary management plans; review and approval; hearings; final order.
- ORS 196.692: Rules.
- ORS 196.825: Criteria for issuance of permit; conditions; consultation with public bodies; hearing; appeal.
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors196.html