(1) For each mitigation bank, the Department of State Lands shall establish a system of resource values and credits. (2) A credit from a mitigation bank may be withdrawn for a condition imposed on a permit in accordance with ORS 196.825 (5), for any other authorization issued in accordance with ORS 196.800 to 196.921 or to resolve a violation of ORS 196.800 to 196.921. At the request of a mitigation bank sponsor, the Director of the Department of State Lands may authorize the withdrawal of mitigation bank credits by a public benefit corporation as defined in ORS 65.001 or a public body as defined by ORS 174.109 designated by the director for the purpose of reserving credits for future use in accordance with this subsection. The director shall manage such transactions to ensure that each credit is used no more than one time to satisfy a use in accordance with this section. (3) Credits from a mitigation bank may be used only as described in subsection (2) of this section for permits, authorizations or resolutions of violations approved within the service area of the mitigation bank, consistent with the mitigation bank instrument, unless the director determines that it is environmentally preferable to exceed this limitation. (4) Credits from an estuarine mitigation bank may be used only as described in subsection (2) of this section for permits, authorizations or resolutions of violations approved within the same estuarine ecological system unless the director determines that it is environmentally preferable to exceed this limitation. (5) The director may not withdraw any credits from any mitigation bank until the director has: (a) Taken actions sufficient to establish hydrological function of the mitigation bank site; (b) Conducted other creation, restoration, enhancement or preservation actions to establish other functions and values at the mitigation bank site; and (c) Evaluated the results of the actions and determined that a high probability exists that the functions and values of the mitigation bank site are equal to or greater than the functions and values of the area to be impacted or that the functions and values of the mitigation bank compensate for unavoidable adverse effects on the waters of this state due to the activities otherwise allowed under ORS 196.600 to 196.921. (6) The price for any mitigation credit shall be set at an amount that will compensate the state for all of the costs and expenses the state has incurred and is expected to incur in establishing and maintaining that portion of the mitigation bank. (7) The director shall not consider the availability or nonavailability of mitigation bank credits in deciding whether to grant or deny any removal or fill permit under ORS 196.600 to 196.921. (8) The director annually shall: (a) Evaluate the functions and values created within each mitigation bank site; and (b) Compare the current functions and values with those that the director anticipated that the mitigation bank would provide. If the director finds any significant disparity between the actual and anticipated functions and values, the director shall: (A) Suspend the withdrawal of credits to that mitigation site; or (B) Take prompt action to ensure that the anticipated functions and values are established. (9) The director may not withdraw credits from the mitigation bank for a specific permit, authorization or resolution of a violation if the director determines that: (a) The credits for that specific permit, authorization or resolution of a violation would not adequately maintain habitat or species diversity; (b) The mitigation bank site for which credits are proposed to be withdrawn is not sufficiently similar in functions and values to the area to be impacted; or (c) The functions and values of the mitigation bank do not compensate for unavoidable adverse effects on the waters of this state due to the activities otherwise allowed under ORS 196.600 to 196.921. [Formerly 541.565; 1997 c.444 §3; 2003 c.738 §7; 2005 c.22 §135; 2007 c.804 §70; 2007 c.849 §10; 2009 c.343 §5; 2011 c.370 §2]
Administrative rules citing this section
- OAR 141-085-0500: General — implements
- OAR 141-085-0506: Policy — implements
- OAR 141-085-0515: Removal-Fill Jurisdiction by Type of Water — implements
- OAR 141-085-0520: Removal-Fill Jurisdiction by Volume of Material — implements
- OAR 141-085-0520: Removal-Fill Jurisdiction by Volume of Material — authority
- OAR 141-085-0525: Measuring and Calculating Volume of Removal and Fill — implements
- OAR 141-085-0530: Exemptions for Certain Activities and Structures — implements
- OAR 141-085-0534: Exemptions for Certain Voluntary Habitat Restoration Activities — implements
- OAR 141-085-0535: Exemptions Specific to Agricultural Activities — implements
- OAR 141-085-0535: Exemptions Specific to Agricultural Activities — authority
- OAR 141-085-0540: Types of Authorizations — implements
- OAR 141-085-0540: Types of Authorizations — authority
- OAR 141-085-0545: Fees for Removal-Fill Applications — implements
- OAR 141-085-0550: Application Requirements for Individual Permits — implements
- OAR 141-085-0555: Individual Removal-Fill Permit Application Review Process — implements
- OAR 141-085-0560: Public Review Process for Individual Removal - Fill Permit Applications — implements
- OAR 141-085-0565: Department Determinations and Considerations in Evaluating Individual Permit Applications — implements
- OAR 141-085-0565: Department Determinations and Considerations in Evaluating Individual Permit Applications — authority
- OAR 141-085-0575: Permit Appeals — implements
- OAR 141-085-0580: Discovery in Contested Cases — implements
- OAR 141-085-0585: Permit Conditions, Permit Expiration Dates and Permit Transfer — implements
- OAR 141-085-0590: Renewal and Extension of Individual Removal-Fill Permits — implements
- OAR 141-085-0595: Permit Requirements and Interagency Coordination for Department of Environmental Quality Approved Remedial Action, Corrections Facilities, Solid Waste Land Fills and Energy Facilities — implements
- OAR 141-085-0665: Expedited Process for Industrial or Traded Sector Sites — implements
- OAR 141-085-0676: Emergency Authorizations — implements
- OAR 141-085-0680: Compensatory Mitigation (CM); Applicability and Principal Objectives — implements
- OAR 141-085-0680: Compensatory Mitigation (CM); Applicability and Principal Objectives — authority
- OAR 141-085-0685: Functions and Values Assessment — implements
- OAR 141-085-0685: Functions and Values Assessment — authority
- OAR 141-085-0690: Eligibility Requirements for CM — implements
- OAR 141-085-0690: Eligibility Requirements for CM — authority
- OAR 141-085-0692: Mitigation Accounting — implements
- OAR 141-085-0692: Mitigation Accounting — authority
- OAR 141-085-0694: Special Requirement for CM — implements
- OAR 141-085-0694: Special Requirement for CM — authority
- OAR 141-085-0700: Financial Security for CM Sites — implements
- OAR 141-085-0705: Requirements for CM Plans — implements
- OAR 141-085-0705: Requirements for CM Plans — authority
- OAR 141-085-0710: Monitoring Requirements for CWM — implements
- OAR 141-085-0710: Monitoring Requirements for CWM — authority
- OAR 141-085-0715: Mitigation for Temporary Impacts — implements
- OAR 141-085-0715: Mitigation for Temporary Impacts — authority
- OAR 141-085-0720: Mitigation Banking Purpose, Applicability and Policies — implements
- OAR 141-085-0720: Mitigation Banking Purpose, Applicability and Policies — authority
- OAR 141-085-0725: Process for Establishing Mitigation Banks — implements
- OAR 141-085-0730: Establishment of Mitigation Credits — implements
- OAR 141-085-0735: Release, Use and Sale of Mitigation Credits — implements
- OAR 141-085-0740: Authorization for Mitigation Banks — implements
- OAR 141-085-0745: In-Lieu Fee Mitigation — implements
- OAR 141-085-0755: Advance Mitigation — implements
- OAR 141-085-0755: Advance Mitigation — authority
- OAR 141-085-0768: Advance Aquatic Resource Plans — implements
- OAR 141-085-0770: Complaints and Investigations — implements
- OAR 141-085-0775: Enforcement Actions and Procedures; Appeals — implements
- OAR 141-085-0780: Revoking or Suspending an Authorization; Allowing Corrective Action — implements
- OAR 141-085-0785: Civil Penalties; Appeals — implements
- OAR 141-089-0620: General — implements
- OAR 141-089-0620: General — authority
- OAR 141-089-0625: General Authorizations (GA); Process for Establishing; Standards and Criteria — implements
- OAR 141-089-0625: General Authorizations (GA); Process for Establishing; Standards and Criteria — authority
- OAR 141-089-0630: Project Applicability — implements
- OAR 141-089-0630: Project Applicability — authority
- OAR 141-089-0635: Fees; Disposition of Fees — implements
- OAR 141-089-0635: Fees; Disposition of Fees — authority
- OAR 141-089-0640: Project Notification — implements
- OAR 141-089-0640: Project Notification — authority
- OAR 141-089-0645: Expiration of Project Eligibility — implements
- OAR 141-089-0645: Expiration of Project Eligibility — authority
- OAR 141-089-0650: General Conditions — implements
- OAR 141-089-0650: General Conditions — authority
- OAR 141-089-0655: Enforcement — implements
- OAR 141-089-0655: Enforcement — authority
- OAR 141-089-0656: Authorization Decision Appeals — implements
- OAR 141-089-0656: Authorization Decision Appeals — authority
- OAR 141-089-0660: Minimal Disturbance within ESH – Purpose — implements
- OAR 141-089-0660: Minimal Disturbance within ESH – Purpose — authority
- OAR 141-089-0665: Minimal Disturbance within ESH – Eligibility Requirements — implements
- OAR 141-089-0665: Minimal Disturbance within ESH – Eligibility Requirements — authority
- OAR 141-089-0670: Minimal Disturbance within ESH – Authorized Activities — implements
- OAR 141-089-0670: Minimal Disturbance within ESH – Authorized Activities — authority
- OAR 141-089-0675: Minimal Disturbance within ESH – Project-Specific Conditions — implements
- OAR 141-089-0675: Minimal Disturbance within ESH – Project-Specific Conditions — authority
- OAR 141-089-0680: Over-Water Structures Fill and Removal – Purpose — implements
- OAR 141-089-0680: Over-Water Structures Fill and Removal – Purpose — authority
- OAR 141-089-0685: Over-Water Structures Fill and Removal – Eligibility Requirements — implements
- OAR 141-089-0685: Over-Water Structures Fill and Removal – Eligibility Requirements — authority
- OAR 141-089-0690: Over-Water Structures Fill and Removal – Authorized Projects — implements
- OAR 141-089-0690: Over-Water Structures Fill and Removal – Authorized Projects — authority
- OAR 141-089-0695: Over-Water Structures Fill and Removal – Project-Specific Conditions — implements
- OAR 141-089-0695: Over-Water Structures Fill and Removal – Project-Specific Conditions — authority
- OAR 141-089-0700: Temporary Impacts to Wetlands and Waterways – Purpose — implements
- OAR 141-089-0700: Temporary Impacts to Wetlands and Waterways – Purpose — authority
- OAR 141-089-0705: Temporary Impacts to Wetlands and Waterways – Eligibility Requirements — implements
- OAR 141-089-0705: Temporary Impacts to Wetlands and Waterways – Eligibility Requirements — authority
- OAR 141-089-0710: Temporary Impacts to Wetlands and Waterways – Authorized Projects — implements
- OAR 141-089-0710: Temporary Impacts to Wetlands and Waterways – Authorized Projects — authority
- OAR 141-089-0715: Temporary Impacts to Wetlands and Waterways – Project-Specific Conditions — implements
- OAR 141-089-0715: Temporary Impacts to Wetlands and Waterways – Project-Specific Conditions — authority
- OAR 141-089-0720: Waterway Bank Stabilization Using Bioengineering – Purpose — implements
- OAR 141-089-0720: Waterway Bank Stabilization Using Bioengineering – Purpose — authority
- OAR 141-089-0725: Waterway Bank Stabilization Using Bioengineering – Eligibility — implements
- OAR 141-089-0725: Waterway Bank Stabilization Using Bioengineering – Eligibility — authority
- OAR 141-089-0730: Waterway Bank Stabilization Using Bioengineering – Authorized Projects — implements
- OAR 141-089-0730: Waterway Bank Stabilization Using Bioengineering – Authorized Projects — authority
- OAR 141-089-0735: Waterway Bank Stabilization Using Bioengineering – Project-Specific Conditions — implements
- OAR 141-089-0735: Waterway Bank Stabilization Using Bioengineering – Project-Specific Conditions — authority
- OAR 141-089-0780: Waterway Habitat Improvement – Purpose — implements
- OAR 141-089-0780: Waterway Habitat Improvement – Purpose — authority
- OAR 141-089-0785: Waterway Habitat Improvement – Eligibility Requirements — implements
- OAR 141-089-0785: Waterway Habitat Improvement – Eligibility Requirements — authority
- OAR 141-089-0790: Waterway Habitat Improvement – Authorized Projects — implements
- OAR 141-089-0790: Waterway Habitat Improvement – Authorized Projects — authority
- OAR 141-089-0795: Waterway Habitat Improvement – Project-Specific Conditions — implements
- OAR 141-089-0795: Waterway Habitat Improvement – Project-Specific Conditions — authority
- OAR 141-089-0800: Wetland Ecosystem Improvement – Purpose — implements
- OAR 141-089-0800: Wetland Ecosystem Improvement – Purpose — authority
- OAR 141-089-0805: Wetland Ecosystem Improvement – Eligibility Requirements — implements
- OAR 141-089-0805: Wetland Ecosystem Improvement – Eligibility Requirements — authority
- OAR 141-089-0810: Wetland Ecosystem Improvement – Authorized Projects — implements
- OAR 141-089-0810: Wetland Ecosystem Improvement – Authorized Projects — authority
- OAR 141-089-0815: Wetland Ecosystem Improvement – Project-Specific Conditions — implements
- OAR 141-089-0815: Wetland Ecosystem Improvement – Project-Specific Conditions — authority
- OAR 141-089-0820: Non-motorized In-stream Placer Mining in ESH – Purpose — implements
- OAR 141-089-0820: Non-motorized In-stream Placer Mining in ESH – Purpose — authority
- OAR 141-089-0823: Non-motorized In-stream Placer Mining within ESH - Definitions — implements
- OAR 141-089-0823: Non-motorized In-stream Placer Mining within ESH - Definitions — authority
- OAR 141-089-0825: Non-motorized In-stream Placer Mining in ESH - Eligibility Requirements — implements
- OAR 141-089-0825: Non-motorized In-stream Placer Mining in ESH - Eligibility Requirements — authority
- OAR 141-089-0827: Non-motorized In-stream Placer Mining within ESH - Expiration and No Transfer — implements
- OAR 141-089-0827: Non-motorized In-stream Placer Mining within ESH - Expiration and No Transfer — authority
- OAR 141-089-0830: Non-motorized In-stream Placer Mining in ESH - Authorized Activities — implements
- OAR 141-089-0830: Non-motorized In-stream Placer Mining in ESH - Authorized Activities — authority
- OAR 141-089-0835: Non-motorized In-stream Placer Mining in ESH - Activity-Specific Conditions — implements
- OAR 141-089-0835: Non-motorized In-stream Placer Mining in ESH - Activity-Specific Conditions — authority
- OAR 141-093-0100: General — implements
- OAR 141-093-0100: General — authority
- OAR 141-093-0103: Agency Process and Standards for Establishing General Permits — implements
- OAR 141-093-0103: Agency Process and Standards for Establishing General Permits — authority
- OAR 141-093-0104: Project Applicability — implements
- OAR 141-093-0104: Project Applicability — authority
- OAR 141-093-0105: Application Requirements and Completeness Review for Authorizing Projects under a General Permit — implements
- OAR 141-093-0105: Application Requirements and Completeness Review for Authorizing Projects under a General Permit — authority
- OAR 141-093-0107: Completeness and Eligibility Review for Authorizing Projects under a GP — implements
- OAR 141-093-0107: Completeness and Eligibility Review for Authorizing Projects under a GP — authority
- OAR 141-093-0110: Public Review Process for Authorizing Projects under a GP — implements
- OAR 141-093-0110: Public Review Process for Authorizing Projects under a GP — authority
- OAR 141-093-0115: Department Determinations and Considerations in Evaluating Applications to Authorize Projects under a GP — implements
- OAR 141-093-0115: Department Determinations and Considerations in Evaluating Applications to Authorize Projects under a GP — authority
- OAR 141-093-0120: Expiration — implements
- OAR 141-093-0120: Expiration — authority
- OAR 141-093-0125: Enforcement — implements
- OAR 141-093-0125: Enforcement — authority
- OAR 141-093-0130: Appeal Process for Authorizations Issued under General Permits — implements
- OAR 141-093-0130: Appeal Process for Authorizations Issued under General Permits — authority
- OAR 141-093-0135: General Conditions — implements
- OAR 141-093-0135: General Conditions — authority
- OAR 141-093-0140: Transportation-Related Structures - Purpose — implements
- OAR 141-093-0140: Transportation-Related Structures - Purpose — authority
- OAR 141-093-0141: Transportation-Related Structures - Eligibility Requirements — implements
- OAR 141-093-0141: Transportation-Related Structures - Eligibility Requirements — authority
- OAR 141-093-0145: Transportation-Related Structures - GP-Specific Application Requirements for Authorizing Projects — implements
- OAR 141-093-0145: Transportation-Related Structures - GP-Specific Application Requirements for Authorizing Projects — authority
- OAR 141-093-0150: Transportation-Related Structures - Authorized Activities — implements
- OAR 141-093-0150: Transportation-Related Structures - Authorized Activities — authority
- OAR 141-093-0151: Transportation-Related Structures - GP-Specific Conditions — implements
- OAR 141-093-0151: Transportation-Related Structures - GP-Specific Conditions — authority
- OAR 141-093-0155: Minor Removal-Fill Impacts - Purpose — implements
- OAR 141-093-0155: Minor Removal-Fill Impacts - Purpose — authority
- OAR 141-093-0160: Minor Removal-Fill Impacts - Eligibility Requirements — implements
- OAR 141-093-0160: Minor Removal-Fill Impacts - Eligibility Requirements — authority
- OAR 141-093-0165: Minor Removal-Fill Impacts - Compensatory Wetland Mitigation — implements
- OAR 141-093-0165: Minor Removal-Fill Impacts - Compensatory Wetland Mitigation — authority
- OAR 141-093-0170: Minor Removal-Fill Impacts - Authorized Activities — implements
- OAR 141-093-0170: Minor Removal-Fill Impacts - Authorized Activities — authority
- OAR 141-093-0175: Minor Removal-Fill Impacts - GP-Specific Conditions — implements
- OAR 141-093-0175: Minor Removal-Fill Impacts - GP-Specific Conditions — authority
- OAR 141-093-0180: Jackson County Vernal Pools - Purpose — implements
- OAR 141-093-0180: Jackson County Vernal Pools - Purpose — authority
- OAR 141-093-0185: Jackson County Vernal Pools - Expiration — implements
- OAR 141-093-0185: Jackson County Vernal Pools - Expiration — authority
- OAR 141-093-0187: Jackson County Vernal Pools - Review Process for Authorizing Projects — implements
- OAR 141-093-0187: Jackson County Vernal Pools - Review Process for Authorizing Projects — authority
- OAR 141-093-0190: Jackson County Vernal Pools - Definitions — implements
- OAR 141-093-0190: Jackson County Vernal Pools - Definitions — authority
- OAR 141-093-0195: Jackson County Vernal Pools - Eligibility Requirements — implements
- OAR 141-093-0195: Jackson County Vernal Pools - Eligibility Requirements — authority
- OAR 141-093-0200: Jackson County Vernal Pools - Mitigation — implements
- OAR 141-093-0200: Jackson County Vernal Pools - Mitigation — authority
- OAR 141-093-0205: Jackson County Vernal Pools - Specific Application Requirements — implements
- OAR 141-093-0205: Jackson County Vernal Pools - Specific Application Requirements — authority
- OAR 141-093-0215: Jackson County Vernal Pools - Specific Conditions — implements
- OAR 141-093-0215: Jackson County Vernal Pools - Specific Conditions — authority
- OAR 141-093-0220: Maintenance Drainage - Purpose — implements
- OAR 141-093-0220: Maintenance Drainage - Purpose — authority
- OAR 141-093-0225: Maintenance Drainage - Eligibility Requirements — implements
- OAR 141-093-0225: Maintenance Drainage - Eligibility Requirements — authority
- OAR 141-093-0230: Maintenance Drainage - Specific Application Requirements — implements
- OAR 141-093-0230: Maintenance Drainage - Specific Application Requirements — authority
- OAR 141-093-0240: Maintenance Drainage - Specific Conditions — implements
- OAR 141-093-0240: Maintenance Drainage - Specific Conditions — authority
This rule cites
- ORS 196.825 — resolved
- ORS 196.800 — resolved
- 196.921 — resolved
- ORS 65.001 — resolved
- ORS 174.109 — resolved
- ORS 196.600 — resolved
Cited by
No inbound citations found.
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors196.html