OAR 141-089-0710: Temporary Impacts to Wetlands and Waterways – Authorized Projects
Edition: Current OARD snapshotEffective: 2024-07-01Last verified: 2026-09-07
Project activities are limited to the following. (1) Temporary impact of 0.50 acres or less of nontidal wetlands; (2) Temporary impact of 0.20 acres or less of tidal wetlands; (3) Placement and removal of structures necessary to isolate a work area from a waterway and conduct fish and wildlife salvage not to exceed 100 linear feet measured at the longest length of isolated work area below the ordinary high water line; and (4) The temporary placement of spud piles (i.e., piles driven into the bed of a waterway to provide stability for a floating work platform) during construction activity.
Official history and status
Statutory/Other Authority: ORS 196.600 - 196.692 & 196.795 - 196.990
Statutes/Other Implemented: ORS 196.600 - 196.692 & 196.795 - 196.990
History: DSL 2-2024, amend filed 05/31/2024, effective 07/01/2024 DSL 11-2018, minor correction filed 01/03/2018, effective 01/03/2018 DSL 2-2011, f. & cert. ef. 3-1-11
This rule cites
No citations extracted.
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/