(1) In accordance with rules adopted pursuant to this chapter, the Department of State Lands shall: (a) Review any proposed wetland conservation plan or proposed amendment to an approved wetland conservation plan against the standards in this section; (b) Prepare a proposed order that approves, approves with conditions or denies the proposed wetland conservation plan or proposed amendment to an approved wetland conservation plan; (c) Provide notice and the opportunity for public hearing and comment on the proposed order; (d) Consult with affected local, state and federal agencies; and (e) Consider the applicable findings made in the order of acknowledgment issued by the Land Conservation and Development Commission. (2) The Director of the Department of State Lands may approve by order a wetland conservation plan that includes the necessary elements of ORS 196.678 (2) and meets the standards of subsections (3) and (4) of this section. (3) A wetland conservation plan shall comply with the following standards: (a) Uses and activities permitted in the plan including fill or removal, or both, conform to sound policies of conservation and will not interfere with public health and safety; (b) Uses and activities permitted in the plan including fill or removal, or both, are not inconsistent with the protection, conservation and best use of the water resources of this state and the use of state waters for navigation, fishing and public recreation; and (c) Designation of wetlands for protection, conservation and development is consistent with the resource functions and values of the area and the capability of the wetland area to withstand alterations and maintain important functions and values. (4) Wetland areas may be designated for development including fill or removal, or both, only if they meet the following standards: (a) There is a public need for the proposed uses set forth in the acknowledged comprehensive plan for the area; (b) Any planned wetland losses shall be fully offset by creation, restoration or enhancement of wetland functions and values or in an estuarine area, estuarine resource replacement is consistent with ORS 196.830; and (c) Practicable, less damaging alternatives, including alternative locations for the proposed use are not available. (5) Approval by the director of a wetland conservation plan shall be conditioned upon adoption by the affected local governments of comprehensive plan policies and land use regulations consistent with and sufficient to implement the wetland conservation plan. Appropriate implementing measures may include the following planning and zoning requirements regulating: (a) Adjacent lands or buffer areas necessary to maintain, protect or restore wetland functions and values, including riparian vegetation, and the uses to be allowed in those areas; (b) Sites for mitigation of impacts from development activities; (c) Upland areas adjacent to wetlands; and (d) Activities or location of buildings, structures and improvements which may affect wetland values or functions, such as storm water runoff. (6) The director shall issue an order approving, approving with conditions or denying a wetland conservation plan, including a clear statement of findings which sets forth the basis for the approval, conditioning or denial. The order shall include: (a) A clear statement of findings that the elements specified in ORS 196.678 (2) have been developed; (b) The findings in support of the determination of compliance or noncompliance with the standards in subsections (3) and (4) of this section; and (c) The conditions under which fill or removal or both may occur. (7) The director may, as a part of an order approving a plan, authorize site-specific fill or removal without an individual permit as required by ORS 196.810 provided that: (a) The director adopts findings demonstrating that fill or removal for any proposed project complies with ORS 196.682 (1)(a) to (e); or (b) The director adopts findings that specific areas of fill or removal within areas designated as development in the plan meet the following standards: (A) The fill or removal approved by the order will result in minimal impacts to the wetland system in the planning area; (B) The public need for the proposed area of fill or removal outweighs the environmental damage likely to result from full development; (C) The director conditions any such order as necessary to ensure that the fill or removal, or both, is designed to minimize impacts from implementing the project; and (D) Full replacement of wetland losses is provided through creation, restoration or enhancement of wetlands with comparable functions and values. (8) Upon a finding by the director that a fill or removal, or both, authorized under subsection (7)(b) of this section has caused or is likely to cause more than minimal adverse impact to the wetland system considering required mitigation conditions, the director shall revise the order to require individual permit review according to ORS 196.682 or provide additional conditions to ensure that adverse impacts are minimal. Such revision shall not be subject to ORS 196.684. [1989 c.837 §11; 1999 c.59 §52]
Administrative rules citing this section
- OAR 141-085-0500: General — implements
- OAR 141-085-0506: Policy — implements
- OAR 141-085-0515: Removal-Fill Jurisdiction by Type of Water — implements
- OAR 141-085-0520: Removal-Fill Jurisdiction by Volume of Material — implements
- OAR 141-085-0520: Removal-Fill Jurisdiction by Volume of Material — authority
- OAR 141-085-0525: Measuring and Calculating Volume of Removal and Fill — implements
- OAR 141-085-0530: Exemptions for Certain Activities and Structures — implements
- OAR 141-085-0534: Exemptions for Certain Voluntary Habitat Restoration Activities — implements
- OAR 141-085-0535: Exemptions Specific to Agricultural Activities — implements
- OAR 141-085-0535: Exemptions Specific to Agricultural Activities — authority
- OAR 141-085-0540: Types of Authorizations — implements
- OAR 141-085-0540: Types of Authorizations — authority
- OAR 141-085-0545: Fees for Removal-Fill Applications — implements
- OAR 141-085-0550: Application Requirements for Individual Permits — implements
- OAR 141-085-0555: Individual Removal-Fill Permit Application Review Process — implements
- OAR 141-085-0560: Public Review Process for Individual Removal - Fill Permit Applications — implements
- OAR 141-085-0565: Department Determinations and Considerations in Evaluating Individual Permit Applications — implements
- OAR 141-085-0565: Department Determinations and Considerations in Evaluating Individual Permit Applications — authority
- OAR 141-085-0575: Permit Appeals — implements
- OAR 141-085-0580: Discovery in Contested Cases — implements
- OAR 141-085-0585: Permit Conditions, Permit Expiration Dates and Permit Transfer — implements
- OAR 141-085-0590: Renewal and Extension of Individual Removal-Fill Permits — implements
- OAR 141-085-0595: Permit Requirements and Interagency Coordination for Department of Environmental Quality Approved Remedial Action, Corrections Facilities, Solid Waste Land Fills and Energy Facilities — implements
- OAR 141-085-0665: Expedited Process for Industrial or Traded Sector Sites — implements
- OAR 141-085-0676: Emergency Authorizations — implements
- OAR 141-085-0680: Compensatory Mitigation (CM); Applicability and Principal Objectives — implements
- OAR 141-085-0680: Compensatory Mitigation (CM); Applicability and Principal Objectives — authority
- OAR 141-085-0685: Functions and Values Assessment — implements
- OAR 141-085-0685: Functions and Values Assessment — authority
- OAR 141-085-0690: Eligibility Requirements for CM — implements
- OAR 141-085-0690: Eligibility Requirements for CM — authority
- OAR 141-085-0692: Mitigation Accounting — implements
- OAR 141-085-0692: Mitigation Accounting — authority
- OAR 141-085-0694: Special Requirement for CM — implements
- OAR 141-085-0694: Special Requirement for CM — authority
- OAR 141-085-0700: Financial Security for CM Sites — implements
- OAR 141-085-0705: Requirements for CM Plans — implements
- OAR 141-085-0705: Requirements for CM Plans — authority
- OAR 141-085-0710: Monitoring Requirements for CWM — implements
- OAR 141-085-0710: Monitoring Requirements for CWM — authority
- OAR 141-085-0715: Mitigation for Temporary Impacts — implements
- OAR 141-085-0715: Mitigation for Temporary Impacts — authority
- OAR 141-085-0720: Mitigation Banking Purpose, Applicability and Policies — implements
- OAR 141-085-0720: Mitigation Banking Purpose, Applicability and Policies — authority
- OAR 141-085-0725: Process for Establishing Mitigation Banks — implements
- OAR 141-085-0730: Establishment of Mitigation Credits — implements
- OAR 141-085-0735: Release, Use and Sale of Mitigation Credits — implements
- OAR 141-085-0740: Authorization for Mitigation Banks — implements
- OAR 141-085-0745: In-Lieu Fee Mitigation — implements
- OAR 141-085-0755: Advance Mitigation — implements
- OAR 141-085-0755: Advance Mitigation — authority
- OAR 141-085-0768: Advance Aquatic Resource Plans — implements
- OAR 141-085-0770: Complaints and Investigations — implements
- OAR 141-085-0775: Enforcement Actions and Procedures; Appeals — implements
- OAR 141-085-0780: Revoking or Suspending an Authorization; Allowing Corrective Action — implements
- OAR 141-085-0785: Civil Penalties; Appeals — implements
- OAR 141-086-0005: Definitions — implements
- OAR 141-086-0010: Request for Approval — implements
- OAR 141-086-0012: Proposed Order — implements
- OAR 141-086-0015: Notice of Opportunity for Comment — implements
- OAR 141-086-0020: Comments — implements
- OAR 141-086-0021: Notice of Hearing — implements
- OAR 141-086-0022: Hearing — implements
- OAR 141-086-0025: Final Agency Decision — implements
- OAR 141-086-0030: Review of Wetland Conservation Plans — implements
- OAR 141-086-0035: Annual Report — implements
- OAR 141-086-0040: Amending a Wetland Conservation Plan — implements
- OAR 141-086-0045: Notice of Opportunity for Comment on Amendments — implements
- OAR 141-086-0050: Hearing on Amendments — implements
- OAR 141-086-0055: Final Agency Decisions on Amendments — implements
- OAR 141-086-0060: Periodic Agency Review of Wetland Conservation Plans — implements
- OAR 141-086-0100: Duty to Notify of Proposed Activities Within Wetlands — implements
- OAR 141-086-0180: Purpose — implements
- OAR 141-086-0180: Purpose — authority
- OAR 141-086-0185: Applicability — implements
- OAR 141-086-0185: Applicability — authority
- OAR 141-086-0200: Definitions — implements
- OAR 141-086-0200: Definitions — authority
- OAR 141-086-0210: Inventory Development Process and Standards — implements
- OAR 141-086-0210: Inventory Development Process and Standards — authority
- OAR 141-086-0220: LWI Reports — implements
- OAR 141-086-0220: LWI Reports — authority
- OAR 141-086-0222: Paper Map Standards — implements
- OAR 141-086-0222: Paper Map Standards — authority
- OAR 141-086-0225: Digital Data Standards — implements
- OAR 141-086-0228: Review and Approval Process — implements
- OAR 141-086-0230: Revisions — implements
- OAR 141-086-0230: Revisions — authority
- OAR 141-086-0240: Landowner Notification — implements
- OAR 141-086-0240: Landowner Notification — authority
- OAR 141-089-0620: General — implements
- OAR 141-089-0620: General — authority
- OAR 141-089-0625: General Authorizations (GA); Process for Establishing; Standards and Criteria — implements
- OAR 141-089-0625: General Authorizations (GA); Process for Establishing; Standards and Criteria — authority
- OAR 141-089-0630: Project Applicability — implements
- OAR 141-089-0630: Project Applicability — authority
- OAR 141-089-0635: Fees; Disposition of Fees — implements
- OAR 141-089-0635: Fees; Disposition of Fees — authority
- OAR 141-089-0640: Project Notification — implements
- OAR 141-089-0640: Project Notification — authority
- OAR 141-089-0645: Expiration of Project Eligibility — implements
- OAR 141-089-0645: Expiration of Project Eligibility — authority
- OAR 141-089-0650: General Conditions — implements
- OAR 141-089-0650: General Conditions — authority
- OAR 141-089-0655: Enforcement — implements
- OAR 141-089-0655: Enforcement — authority
- OAR 141-089-0656: Authorization Decision Appeals — implements
- OAR 141-089-0656: Authorization Decision Appeals — authority
- OAR 141-089-0660: Minimal Disturbance within ESH – Purpose — implements
- OAR 141-089-0660: Minimal Disturbance within ESH – Purpose — authority
- OAR 141-089-0665: Minimal Disturbance within ESH – Eligibility Requirements — implements
- OAR 141-089-0665: Minimal Disturbance within ESH – Eligibility Requirements — authority
- OAR 141-089-0670: Minimal Disturbance within ESH – Authorized Activities — implements
- OAR 141-089-0670: Minimal Disturbance within ESH – Authorized Activities — authority
- OAR 141-089-0675: Minimal Disturbance within ESH – Project-Specific Conditions — implements
- OAR 141-089-0675: Minimal Disturbance within ESH – Project-Specific Conditions — authority
- OAR 141-089-0680: Over-Water Structures Fill and Removal – Purpose — implements
- OAR 141-089-0680: Over-Water Structures Fill and Removal – Purpose — authority
- OAR 141-089-0685: Over-Water Structures Fill and Removal – Eligibility Requirements — implements
- OAR 141-089-0685: Over-Water Structures Fill and Removal – Eligibility Requirements — authority
- OAR 141-089-0690: Over-Water Structures Fill and Removal – Authorized Projects — implements
- OAR 141-089-0690: Over-Water Structures Fill and Removal – Authorized Projects — authority
- OAR 141-089-0695: Over-Water Structures Fill and Removal – Project-Specific Conditions — implements
- OAR 141-089-0695: Over-Water Structures Fill and Removal – Project-Specific Conditions — authority
- OAR 141-089-0700: Temporary Impacts to Wetlands and Waterways – Purpose — implements
- OAR 141-089-0700: Temporary Impacts to Wetlands and Waterways – Purpose — authority
- OAR 141-089-0705: Temporary Impacts to Wetlands and Waterways – Eligibility Requirements — implements
- OAR 141-089-0705: Temporary Impacts to Wetlands and Waterways – Eligibility Requirements — authority
- OAR 141-089-0710: Temporary Impacts to Wetlands and Waterways – Authorized Projects — implements
- OAR 141-089-0710: Temporary Impacts to Wetlands and Waterways – Authorized Projects — authority
- OAR 141-089-0715: Temporary Impacts to Wetlands and Waterways – Project-Specific Conditions — implements
- OAR 141-089-0715: Temporary Impacts to Wetlands and Waterways – Project-Specific Conditions — authority
- OAR 141-089-0720: Waterway Bank Stabilization Using Bioengineering – Purpose — implements
- OAR 141-089-0720: Waterway Bank Stabilization Using Bioengineering – Purpose — authority
- OAR 141-089-0725: Waterway Bank Stabilization Using Bioengineering – Eligibility — implements
- OAR 141-089-0725: Waterway Bank Stabilization Using Bioengineering – Eligibility — authority
- OAR 141-089-0730: Waterway Bank Stabilization Using Bioengineering – Authorized Projects — implements
- OAR 141-089-0730: Waterway Bank Stabilization Using Bioengineering – Authorized Projects — authority
- OAR 141-089-0735: Waterway Bank Stabilization Using Bioengineering – Project-Specific Conditions — implements
- OAR 141-089-0735: Waterway Bank Stabilization Using Bioengineering – Project-Specific Conditions — authority
- OAR 141-089-0780: Waterway Habitat Improvement – Purpose — implements
- OAR 141-089-0780: Waterway Habitat Improvement – Purpose — authority
- OAR 141-089-0785: Waterway Habitat Improvement – Eligibility Requirements — implements
- OAR 141-089-0785: Waterway Habitat Improvement – Eligibility Requirements — authority
- OAR 141-089-0790: Waterway Habitat Improvement – Authorized Projects — implements
- OAR 141-089-0790: Waterway Habitat Improvement – Authorized Projects — authority
- OAR 141-089-0795: Waterway Habitat Improvement – Project-Specific Conditions — implements
- OAR 141-089-0795: Waterway Habitat Improvement – Project-Specific Conditions — authority
- OAR 141-089-0800: Wetland Ecosystem Improvement – Purpose — implements
- OAR 141-089-0800: Wetland Ecosystem Improvement – Purpose — authority
- OAR 141-089-0805: Wetland Ecosystem Improvement – Eligibility Requirements — implements
- OAR 141-089-0805: Wetland Ecosystem Improvement – Eligibility Requirements — authority
- OAR 141-089-0810: Wetland Ecosystem Improvement – Authorized Projects — implements
- OAR 141-089-0810: Wetland Ecosystem Improvement – Authorized Projects — authority
- OAR 141-089-0815: Wetland Ecosystem Improvement – Project-Specific Conditions — implements
- OAR 141-089-0815: Wetland Ecosystem Improvement – Project-Specific Conditions — authority
- OAR 141-089-0820: Non-motorized In-stream Placer Mining in ESH – Purpose — implements
- OAR 141-089-0820: Non-motorized In-stream Placer Mining in ESH – Purpose — authority
- OAR 141-089-0823: Non-motorized In-stream Placer Mining within ESH - Definitions — implements
- OAR 141-089-0823: Non-motorized In-stream Placer Mining within ESH - Definitions — authority
- OAR 141-089-0825: Non-motorized In-stream Placer Mining in ESH - Eligibility Requirements — implements
- OAR 141-089-0825: Non-motorized In-stream Placer Mining in ESH - Eligibility Requirements — authority
- OAR 141-089-0827: Non-motorized In-stream Placer Mining within ESH - Expiration and No Transfer — implements
- OAR 141-089-0827: Non-motorized In-stream Placer Mining within ESH - Expiration and No Transfer — authority
- OAR 141-089-0830: Non-motorized In-stream Placer Mining in ESH - Authorized Activities — implements
- OAR 141-089-0830: Non-motorized In-stream Placer Mining in ESH - Authorized Activities — authority
- OAR 141-089-0835: Non-motorized In-stream Placer Mining in ESH - Activity-Specific Conditions — implements
- OAR 141-089-0835: Non-motorized In-stream Placer Mining in ESH - Activity-Specific Conditions — authority
- OAR 141-093-0100: General — implements
- OAR 141-093-0100: General — authority
- OAR 141-093-0103: Agency Process and Standards for Establishing General Permits — implements
- OAR 141-093-0103: Agency Process and Standards for Establishing General Permits — authority
- OAR 141-093-0104: Project Applicability — implements
- OAR 141-093-0104: Project Applicability — authority
- OAR 141-093-0105: Application Requirements and Completeness Review for Authorizing Projects under a General Permit — implements
- OAR 141-093-0105: Application Requirements and Completeness Review for Authorizing Projects under a General Permit — authority
- OAR 141-093-0107: Completeness and Eligibility Review for Authorizing Projects under a GP — implements
- OAR 141-093-0107: Completeness and Eligibility Review for Authorizing Projects under a GP — authority
- OAR 141-093-0110: Public Review Process for Authorizing Projects under a GP — implements
- OAR 141-093-0110: Public Review Process for Authorizing Projects under a GP — authority
- OAR 141-093-0115: Department Determinations and Considerations in Evaluating Applications to Authorize Projects under a GP — implements
- OAR 141-093-0115: Department Determinations and Considerations in Evaluating Applications to Authorize Projects under a GP — authority
- OAR 141-093-0120: Expiration — implements
- OAR 141-093-0120: Expiration — authority
- OAR 141-093-0125: Enforcement — implements
- OAR 141-093-0125: Enforcement — authority
- OAR 141-093-0130: Appeal Process for Authorizations Issued under General Permits — implements
- OAR 141-093-0130: Appeal Process for Authorizations Issued under General Permits — authority
- OAR 141-093-0135: General Conditions — implements
- OAR 141-093-0135: General Conditions — authority
- OAR 141-093-0140: Transportation-Related Structures - Purpose — implements
- OAR 141-093-0140: Transportation-Related Structures - Purpose — authority
- OAR 141-093-0141: Transportation-Related Structures - Eligibility Requirements — implements
- OAR 141-093-0141: Transportation-Related Structures - Eligibility Requirements — authority
- OAR 141-093-0145: Transportation-Related Structures - GP-Specific Application Requirements for Authorizing Projects — implements
- OAR 141-093-0145: Transportation-Related Structures - GP-Specific Application Requirements for Authorizing Projects — authority
- OAR 141-093-0150: Transportation-Related Structures - Authorized Activities — implements
- OAR 141-093-0150: Transportation-Related Structures - Authorized Activities — authority
- OAR 141-093-0151: Transportation-Related Structures - GP-Specific Conditions — implements
- OAR 141-093-0151: Transportation-Related Structures - GP-Specific Conditions — authority
This rule cites
- ORS 196.678 — resolved
- ORS 196.830 — resolved
- ORS 196.810 — resolved
- ORS 196.682 — resolved
- ORS 196.684 — resolved
Cited by
- ORS 196.684: Amendment of plans; review of plans by department; review of orders by Land Use Board of Appeals.
- ORS 196.686: Acknowledged estuary management plans; review and approval; hearings; final order.
- OAR 141-086-0010: Request for Approval
- OAR 141-086-0012: Proposed Order
- OAR 141-086-0015: Notice of Opportunity for Comment
- OAR 141-086-0021: Notice of Hearing
- OAR 141-086-0025: Final Agency Decision
- OAR 141-086-0035: Annual Report
- OAR 141-120-0040: Wetland Resource Designations
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors196.html