ORS 537.735: Rules designating critical ground water area.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
(1) A rule adopted by the Water Resources Commission under ORS 537.730 shall: (a) Define the boundaries of the critical ground water area and shall indicate which of the ground water reservoirs located either in whole or in part within the area in question are included within the critical ground water area. Any number of ground water reservoirs which either wholly or partially overlie one another may be included within the same critical ground water area. (b) Contain a provision requiring a periodic review of conditions in the critical ground water area. The review shall be in sufficient detail to evaluate the continuing need for the critical ground water area designation and shall occur no less frequently than once every 10 years. (2) In adopting the rule, the commission shall consider any orders or permits applicable to the reservoir issued by the governing board or State Geologist of the State Department of Geology and Mineral Industries under ORS chapter 522. (3) A rule by the commission under subsection (1) of this section may include any one or more of the following corrective control provisions: (a) A provision closing the critical ground water area to any further appropriation of ground water, in which event the commission shall thereafter refuse to accept any application for a permit to appropriate ground water located within such critical area. (b) A provision determining the permissible total withdrawal of ground water in the critical area each day, month or year. (c) The disposition of any application for a water right permit for the use of water in the area that is pending at the time the commission initiates the rulemaking process or that is received during the rulemaking process. (d) Any one or more provisions making such additional requirements as are necessary to protect the public welfare, health and safety in accordance with the intent, purposes and requirements of ORS 537.505 to 537.795 and 537.992. (e) A provision closing all or part of the critical ground water area to further appropriation of ground water for its thermal characteristics. (f) A provision determining the permissible change in thermal characteristics of ground water in all or part of the critical ground water area each day, month or year. Insofar as may be reasonably done, the Water Resources Director shall apportion the permissible total temperature impact among those appropriators whose exercise of valid rights in the critical area affect the thermal characteristics of the ground water, in accordance with the relative dates of priority of such rights. [1955 c.708 §27; 1981 c.589 §6; 1981 c.919 §1; 1985 c.673 §63; 1989 c.201 §5; 1991 c.400 §5]
Administrative rules citing this section
- OAR 690-010-0110: Definitions — implements
- OAR 690-010-0120: Required Criteria for Designation of Critical Ground Water Area — implements
- OAR 690-010-0130: Additional Requirements for Critical Ground Water Area Rulemaking Process — implements
- OAR 690-010-0150: Engagement with Federally Recognized Indian Tribes — implements
- OAR 690-010-0160: Content, Filing, and Review of Adopted Critical Groundwater Area Rules — implements
- OAR 690-010-0170: Initial Notification of Proposed Corrective Control Orders — implements
- OAR 690-010-0180: Notice of Proposed Corrective Control Orders — implements
- OAR 690-010-0190: Notices of Party Status and Petitions for Party Status — implements
- OAR 690-010-0200: Scope of Contested Case Hearing — implements
- OAR 690-010-0210: Conduct of Contested Case — implements
- OAR 690-010-0220: Exceptions to Proposed Order — implements
- OAR 690-010-0230: Final Order in Contested Case — implements
- OAR 690-010-0240: Procedure for Making Changes to Existing Critical Groundwater Area — implements
- OAR 690-013-0005: Introduction — implements
- OAR 690-013-0010: Definitions — implements
- OAR 690-013-0030: Eligibility to Petition — implements
- OAR 690-013-0050: Individual Applications — implements
- OAR 690-013-0070: Interim Transfers — implements
- OAR 690-013-0100: District Petitions — implements
- OAR 690-013-0110: Requests for Additional Information — implements
- OAR 690-013-0150: District Shall Certify Petition — implements
- OAR 690-013-0310: Processing of Petition — implements
- OAR 690-013-0350: Field Verification of the Petition and Map — implements
- OAR 690-190-0005: Purpose and Applicability — implements
- OAR 690-190-0010: Definitions — implements
- OAR 690-190-0010: Definitions — authority
- OAR 690-190-0100: Recording Requirements — implements
- OAR 690-190-0100: Recording Requirements — authority
- OAR 690-190-0200: Compliance and Enforcement — implements
- OAR 690-190-0200: Compliance and Enforcement — authority
- OAR 690-200-0005: Basis for Regulatory Authority — implements
- OAR 690-200-0005: Basis for Regulatory Authority — authority
- OAR 690-200-0020: General Statement About the Standards — implements
- OAR 690-200-0020: General Statement About the Standards — authority
- OAR 690-200-0021: Special Standards — implements
- OAR 690-200-0021: Special Standards — authority
- OAR 690-200-0027: Restrictions on Water Supply Well Construction and Use in Critical Groundwater Areas or Areas Withdrawn by Commission Order — implements
- OAR 690-200-0027: Restrictions on Water Supply Well Construction and Use in Critical Groundwater Areas or Areas Withdrawn by Commission Order — authority
- OAR 690-200-0028: Designated Special Area Standards — implements
- OAR 690-200-0028: Designated Special Area Standards — authority
- OAR 690-200-0046: Perched Ground Water — implements
- OAR 690-200-0046: Perched Ground Water — authority
- OAR 690-200-0050: Definitions — implements
- OAR 690-200-0050: Definitions — authority
- OAR 690-205-0005: License or Permit Required to Construct Water Supply Wells — implements
- OAR 690-205-0005: License or Permit Required to Construct Water Supply Wells — authority
- OAR 690-205-0010: Water Supply Well Constructor License Examination — implements
- OAR 690-205-0010: Water Supply Well Constructor License Examination — authority
- OAR 690-205-0020: Water Supply Well Constructor’s License, Experience Requirements, Trainee Card and Temporary Authorization — implements
- OAR 690-205-0020: Water Supply Well Constructor’s License, Experience Requirements, Trainee Card and Temporary Authorization — authority
- OAR 690-205-0025: Term of Water Well Constructor License and License Fees — implements
- OAR 690-205-0025: Term of Water Well Constructor License and License Fees — authority
- OAR 690-205-0045: Continuing Education Requirement — implements
- OAR 690-205-0045: Continuing Education Requirement — authority
- OAR 690-205-0175: Landowner Well Construction Permit, Fee and Bond — implements
- OAR 690-205-0175: Landowner Well Construction Permit, Fee and Bond — authority
- OAR 690-205-0200: Water Supply Well Construction Notice Required (Start Card) — implements
- OAR 690-205-0200: Water Supply Well Construction Notice Required (Start Card) — authority
- OAR 690-205-0205: Start Card Reporting Requirements — implements
- OAR 690-205-0205: Start Card Reporting Requirements — authority
- OAR 690-205-0210: Well Report Required (Water Supply Well Log) — implements
- OAR 690-205-0210: Well Report Required (Water Supply Well Log) — authority
- OAR 690-210-0130: Sealing of Wells in Unconsolidated Formations Without Significant Clay Beds — implements
- OAR 690-210-0130: Sealing of Wells in Unconsolidated Formations Without Significant Clay Beds — authority
- OAR 690-210-0140: Sealing of Water Supply Wells in Unconsolidated Formations with Significant Clay Beds — implements
- OAR 690-210-0140: Sealing of Water Supply Wells in Unconsolidated Formations with Significant Clay Beds — authority
- OAR 690-210-0150: Sealing of Water Supply Wells in Consolidated Formations — implements
- OAR 690-210-0150: Sealing of Water Supply Wells in Consolidated Formations — authority
- OAR 690-210-0155: Additional Standards for Artesian Water Supply Wells — implements
- OAR 690-210-0155: Additional Standards for Artesian Water Supply Wells — authority
- OAR 690-210-0160: Additional Standards for Filter Pack Wells with Surface Casing — implements
- OAR 690-210-0160: Additional Standards for Filter Pack Wells with Surface Casing — authority
- OAR 690-210-0170: Additional Standards for Filter Pack Wells without Surface Casing — implements
- OAR 690-210-0170: Additional Standards for Filter Pack Wells without Surface Casing — authority
- OAR 690-210-0180: Additional Standards for Driven or Jetted Wells — implements
- OAR 690-210-0180: Additional Standards for Driven or Jetted Wells — authority
- OAR 690-210-0190: Steel Casing — implements
- OAR 690-210-0190: Steel Casing — authority
- OAR 690-210-0220: Plastic Casing Joints — implements
- OAR 690-210-0220: Plastic Casing Joints — authority
- OAR 690-210-0230: Inner Casing — implements
- OAR 690-210-0230: Inner Casing — authority
- OAR 690-210-0240: Casing Shall be Centered — implements
- OAR 690-210-0240: Casing Shall be Centered — authority
- OAR 690-210-0270: Pitless Well Adapters and Units — implements
- OAR 690-210-0270: Pitless Well Adapters and Units — authority
- OAR 690-210-0280: Access Ports, Dedicated Measuring Tubes and Airlines — implements
- OAR 690-210-0280: Access Ports, Dedicated Measuring Tubes and Airlines — authority
- OAR 690-210-0290: Liner Pipe — implements
- OAR 690-210-0290: Liner Pipe — authority
- OAR 690-210-0320: Methods of Placement of Cement Grout or Concrete — implements
- OAR 690-210-0320: Methods of Placement of Cement Grout or Concrete — authority
- OAR 690-210-0380: Disinfection of a Well — implements
- OAR 690-210-0380: Disinfection of a Well — authority
- OAR 690-210-0400: Construction of Dug Wells — implements
- OAR 690-210-0400: Construction of Dug Wells — authority
- OAR 690-210-0410: Buried Slab Construction — implements
- OAR 690-210-0410: Buried Slab Construction — authority
- OAR 690-210-0420: Surface Curbing — implements
- OAR 690-210-0420: Surface Curbing — authority
- OAR 690-215-0005: Prevention of Groundwater Contamination, Health Hazard, and Waste — implements
- OAR 690-215-0005: Prevention of Groundwater Contamination, Health Hazard, and Waste — authority
- OAR 690-215-0017: Down Well Continuous Water Treatment and Back-Siphon Prevention Devices — implements
- OAR 690-215-0017: Down Well Continuous Water Treatment and Back-Siphon Prevention Devices — authority
- OAR 690-215-0055: Well Identification Label Maintenance — implements
- OAR 690-215-0055: Well Identification Label Maintenance — authority
- OAR 690-215-0060: Access Ports, Dedicated Measuring Tubes and Airlines — implements
- OAR 690-215-0060: Access Ports, Dedicated Measuring Tubes and Airlines — authority
- OAR 690-215-0070: Pressure Gauge — implements
- OAR 690-215-0070: Pressure Gauge — authority
- OAR 690-215-0201: Dedicated Measuring Tube — implements
- OAR 690-215-0201: Dedicated Measuring Tube — authority
- OAR 690-220-0050: Abandonment of Uncased Wells — implements
- OAR 690-220-0050: Abandonment of Uncased Wells — authority
- OAR 690-225-0020: Investigation of Alleged Violations — implements
- OAR 690-225-0020: Investigation of Alleged Violations — authority
- OAR 690-225-0030: Enforcement Actions — implements
- OAR 690-225-0030: Enforcement Actions — authority
- OAR 690-225-0110: Schedule of Civil Penalties — implements
- OAR 690-225-0110: Schedule of Civil Penalties — authority
- OAR 690-240-0005: Introduction — implements
- OAR 690-240-0005: Introduction — authority
- OAR 690-240-0006: Special Standards — implements
- OAR 690-240-0006: Special Standards — authority
- OAR 690-240-0010: Definitions — implements
- OAR 690-240-0010: Definitions — authority
- OAR 690-240-0024: Well Identification Label — implements
- OAR 690-240-0024: Well Identification Label — authority
- OAR 690-240-0026: Well Identification Label Maintenance — implements
- OAR 690-240-0026: Well Identification Label Maintenance — authority
- OAR 690-240-0060: Monitoring Well Constructor License Examination — implements
- OAR 690-240-0060: Monitoring Well Constructor License Examination — authority
- OAR 690-240-0065: Monitoring Well Constructor License, Experience Requirements, Trainee Card and Temporary Authorization — implements
- OAR 690-240-0065: Monitoring Well Constructor License, Experience Requirements, Trainee Card and Temporary Authorization — authority
- OAR 690-240-0070: Terms of Monitoring Well Constructor License and License Fees — implements
- OAR 690-240-0070: Terms of Monitoring Well Constructor License and License Fees — authority
- OAR 690-240-0210: Continuing Education Requirement — implements
- OAR 690-240-0210: Continuing Education Requirement — authority
- OAR 690-240-0340: Landowner Well Construction Permit, Fee and Bond — authority
- OAR 690-240-0375: Monitoring Well Construction Notice Required (Start Card) — implements
- OAR 690-240-0375: Monitoring Well Construction Notice Required (Start Card) — authority
- OAR 690-240-0385: Start Card Reporting Requirements — implements
- OAR 690-240-0385: Start Card Reporting Requirements — authority
- OAR 690-240-0395: Monitoring Well Report Required (Monitoring Well Log) — implements
- OAR 690-240-0395: Monitoring Well Report Required (Monitoring Well Log) — authority
- OAR 690-240-0410: Monitoring Well Construction: General — implements
- OAR 690-240-0410: Monitoring Well Construction: General — authority
- OAR 690-240-0560: Investigation of Alleged Violations — implements
- OAR 690-240-0560: Investigation of Alleged Violations — authority
- OAR 690-240-0580: Enforcement Actions — implements
- OAR 690-240-0580: Enforcement Actions — authority
- OAR 690-240-0640: Schedule of Civil Penalties — implements
- OAR 690-240-0640: Schedule of Civil Penalties — authority
- OAR 690-260-0030: Notice of Violation — implements
- OAR 690-260-0030: Notice of Violation — authority
- OAR 690-260-0040: Classification of Violations — implements
- OAR 690-260-0040: Classification of Violations — authority
- OAR 690-260-0060: Notice of Assessment of Civil Penalty — implements
- OAR 690-260-0060: Notice of Assessment of Civil Penalty — authority
- OAR 690-300-0010: Definitions — authority
- OAR 690-410-0070: Water Allocation — authority
- OAR 690-512-0010: Definitions — authority
- OAR 690-512-0020: Administrative Boundaries — implements
- OAR 690-512-0020: Administrative Boundaries — authority
- OAR 690-512-0041: Harney Basin Critical Groundwater Area — implements
- OAR 690-512-0041: Harney Basin Critical Groundwater Area — authority
- OAR 690-512-0050: Permissible Total Withdrawal for Subareas Within the Harney Basin Critical Groundwater Area — implements
- OAR 690-512-0050: Permissible Total Withdrawal for Subareas Within the Harney Basin Critical Groundwater Area — authority
- OAR 690-512-0060: Determination of Initial Allotment for All Groundwater Rights — implements
- OAR 690-512-0060: Determination of Initial Allotment for All Groundwater Rights — authority
- OAR 690-512-0070: Scheduling Water Use Reductions to Meet the Permissible Total Withdrawal — implements
- OAR 690-512-0070: Scheduling Water Use Reductions to Meet the Permissible Total Withdrawal — authority
- OAR 690-512-0080: Adaptive Management of the Harney Basin Critical Groundwater Area — implements
- OAR 690-512-0080: Adaptive Management of the Harney Basin Critical Groundwater Area — authority
This rule cites
- ORS 537.730 — resolved
- ORS chapter 522 — target_record_not_published
- ORS 537.505 — resolved
- 537.795 — resolved
- 537.992 — resolved
Cited by
- OAR 690-010-0130: Additional Requirements for Critical Ground Water Area Rulemaking Process
- OAR 690-010-0160: Content, Filing, and Review of Adopted Critical Groundwater Area Rules
- OAR 690-200-0027: Restrictions on Water Supply Well Construction and Use in Critical Groundwater Areas or Areas Withdrawn by Commission Order
- OAR 690-512-0010: Definitions
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors537.html