ORS 537.170: Protest of proposed final order; final order; appeal.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
(1) If a protest of a proposed final order issued under ORS 537.153 is filed under ORS 536.077 and, after the contested case hearing or, if a hearing is not held, after the close of the period allowed to file a protest, the Water Resources Director determines that the proposed use does not comply with the standards set forth in ORS 543.017 or rules adopted by the Water Resources Commission under ORS 543.017 or would otherwise impair or be detrimental to the public interest, the director shall issue a final order rejecting the application or modifying the proposed final order to conform to the public interest. (2) If a protest of a proposed final order issued under ORS 537.153 is filed under ORS 536.077 and, after the contested case hearing or, if a hearing is not held, after the close of the period allowed to file a protest, the director determines that the proposed use would not impair or be detrimental to the public interest, the director shall issue a final order approving the application or otherwise modifying the proposed final order. (3) A final order may set forth any of the provisions or restrictions to be included in the permit concerning the use, control and management of the water to be appropriated for the project, including, but not limited to, a specification of reservoir operation and minimum releases to protect the public interest. (4) An interlocutory appeal under ORS 183.480 (3) is not allowed in a contested case proceeding under this section. (5) If a contested case hearing is not held under ORS 537.153 (7)(a) where the final order modifies the proposed final order, the applicant, a person granted party status or a protestant may submit a protest under ORS 536.076 or 536.077 within 14 days after the director issues the final order, except that the issues on which a contested case hearing may be requested and conducted under this subsection are limited to issues based on the modifications to the proposed final order. The department must hold a hearing if the protestant is an applicant. (6) If a protest of a proposed final order issued under ORS 537.153 is filed under ORS 536.077 by a person other than the applicant and, as described in ORS 537.153 (7)(a), the director issues a final order without holding a contested case hearing, a protestant may appeal the provisions of the final order in the manner established in ORS chapter 183 for appeal of orders in other than contested cases. (7) If the presumption of public interest under ORS 537.153 (2) is overcome, then before issuing a final order, the director or the commission, if applicable, shall make the final determination of whether the proposed use or the proposed use as modified in the proposed final order would impair or be detrimental to the public interest by considering: (a) Conserving the highest use of the water for all purposes, including irrigation, domestic use, municipal water supply, power development, public recreation, protection of commercial and game fishing and wildlife, fire protection, mining, industrial purposes, navigation, scenic attraction or any other beneficial use to which the water may be applied for which it may have a special value to the public. (b) The maximum economic development of the waters involved. (c) The control of the waters of this state for all beneficial purposes, including drainage, sanitation and flood control. (d) The amount of waters available for appropriation for beneficial use. (e) The prevention of wasteful, uneconomic, impracticable or unreasonable use of the waters involved. (f) All vested and inchoate rights to the waters of this state or to the use of the waters of this state, and the means necessary to protect such rights. (g) The state water resources policy formulated under ORS 536.295 to 536.350 and 537.505 to 537.534. (8) Upon issuing a final order, the director shall notify the applicant and each person who submitted written comments or protests or otherwise requested notice of the final order and send a copy of the final order to any person who requested a copy and paid the fee required under ORS 536.050 (1)(p). [Amended by 1955 c.707 §36; 1961 c.224 §12; 1963 c.378 §1; 1975 c.581 §26; 1985 c.569 §19; 1985 c.673 §30; 1995 c.416 §13; 1997 c.587 §6; 2003 c.75 §96; 2025 c.575 §6]
Administrative rules citing this section
- OAR 690-033-0115: Upper Columbia Rules (Above Bonneville Dam): Geographic Scope — implements
- OAR 690-033-0120: Upper Columbia Rules (Above Bonneville Dam): Determination of Consistency With the Fish and Wildlife Program — implements
- OAR 690-033-0130: Upper Columbia Rules (Above Bonneville Dam): Flow Management — implements
- OAR 690-033-0140: Upper Columbia Rules (Above Bonneville Dam): Exemptions — implements
- OAR 690-033-0210: Lower Columbia Rules (Below Bonneville Dam): Geographic Scope — implements
- OAR 690-033-0310: Statewide Rules: Geographic Scope — implements
- OAR 690-033-0320: Statewide Rules: Rule Review — implements
- OAR 690-033-0330: Statewide Rules: Review of Proposed Water Use — implements
- OAR 690-033-0340: Statewide Rules: Public Interest Review Presumption — implements
- OAR 690-077-0019: State Agency Instream Water Right Applications: Process for Instream Water Right Certificate Requests — authority
- OAR 690-077-0033: Application Processing: Public Interest Presumption — implements
- OAR 690-077-0047: Application Processing: Final Orders — implements
- OAR 690-077-0047: Application Processing: Final Orders — authority
- OAR 690-077-0048: Application Processing: Final Public Interest Determination — authority
- OAR 690-077-0051: Application Processing: Contested Case Hearing on Final Order that Modifies Proposed Final Order — implements
- OAR 690-077-0051: Application Processing: Contested Case Hearing on Final Order that Modifies Proposed Final Order — authority
- OAR 690-310-0000: Purpose — implements
- OAR 690-310-0110: Public Interest Presumption; Surface Water — implements
- OAR 690-310-0120: Public Interest Review; Surface Water — implements
- OAR 690-310-0160: Protests and Conduct of Contested Case; Final Orders on Default when No Protest Filed — implements
- OAR 690-310-0190: Final Order for Proposed Use of Surface Water when Proposed Final Order Protested — implements
- OAR 690-310-0210: Contested Case Hearing on Final Order that Modifies Proposed Final Order — implements
- OAR 690-310-0220: Final Determination of Public Interest (Surface Water) or Public Welfare, Safety and Health (Groundwater) — implements
- OAR 690-320-0050: Temperature Control — implements
- OAR 690-330-0030: Temperature Control — implements
This rule cites
- ORS 537.153 — resolved
- ORS 536.077 — resolved
- ORS 543.017 — resolved
- ORS 183.480 — resolved
- ORS 536.076 — resolved
- 536.077 — resolved
- ORS chapter 183 — target_record_not_published
- ORS 536.295 — resolved
- 536.350 — resolved
- 537.505 — resolved
- 537.534 — resolved
- ORS 536.050 — resolved
Cited by
- ORS 536.580: Rights acquired prior to August 3, 1955, not affected.
- ORS 536.750: Powers of commission after declaration of drought; rules.
- ORS 537.135: Permit required to appropriate water for recharging ground water sources; minimum perennial streamflow required for permit; exception.
- ORS 537.147: Permit to use stored water; fee.
- ORS 537.153: Review of application; proposed final order; presumption that use will not impair or be detrimental to public interest; standing; protest; final order; contested case hearing.
- ORS 537.160: Approval for beneficial use; agreement authorizing use of ditch for waste or seepage water.
- ORS 537.173: Exceptions to final order; modified order.
- ORS 537.249: Election to have proposed reservation considered as application for permit or rulemaking proceeding.
- ORS 537.343: Proposed final order; conditions.
- ORS 537.352: Precedence of uses.
- ORS 537.358: Rules for reservation for future economic development; application for use of reserved water.
- ORS 540.537: Order allowing exchange; order terminating exchange.
- ORS 543.765: Certificate to use water for hydroelectric purposes within artificial delivery system; expedited application process; certificate conditions; annual payments; fees.
- OAR 690-002-0023: Agency Representation by Officer or Employee
- OAR 690-002-0190: Exceptions to Final Orders of the Director
- OAR 690-019-0030: Duration of Drought Declaration
- OAR 690-019-0040: Emergency Water Use Permit
- OAR 690-033-0340: Statewide Rules: Public Interest Review Presumption
- OAR 690-051-0010: Definitions
- OAR 690-051-0160: Standards for Evaluation
- OAR 690-051-0300: Interim Orders
- OAR 690-077-0033: Application Processing: Public Interest Presumption
- OAR 690-077-0037: Application Processing: Public Interest Review
- OAR 690-077-0039: Application Processing: Proposed Final Order
- OAR 690-077-0043: Application Processing: Protests and Conduct of Contested Case; Final Orders on Default when No Protest Filed
- OAR 690-077-0048: Application Processing: Final Public Interest Determination
- OAR 690-077-0054: Conversion of Minimum Perennial Streamflows to Instream Water Rights
- OAR 690-077-0100: Miscellaneous Provisions: Precedence of Future Uses
- OAR 690-310-0110: Public Interest Presumption; Surface Water
- OAR 690-310-0120: Public Interest Review; Surface Water
- OAR 690-310-0150: Proposed Final Order
- OAR 690-310-0160: Protests and Conduct of Contested Case; Final Orders on Default when No Protest Filed
- OAR 690-310-0220: Final Determination of Public Interest (Surface Water) or Public Welfare, Safety and Health (Groundwater)
- OAR 690-340-0060: Expedited Review Process for Applications to Use Stored Water Exclusively
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors537.html