ORS 469.300: Definitions.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
As used in ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992, unless the context requires otherwise: (1) “Applicant” means any person who makes application for a site certificate in the manner provided in ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992. (2) “Application” means a request for approval of a particular site or sites for the construction and operation of an energy facility or the construction and operation of an additional energy facility upon a site for which a certificate has already been issued, filed in accordance with the procedures established pursuant to ORS 469.300 to 469.563, 469.590 to 469.619, 469.930 and 469.992. (3) “Associated transmission lines” means new transmission lines constructed to connect an energy facility to the first point of junction of such transmission line or lines with either a power distribution system or an interconnected primary transmission system or both or to the Northwest Power Grid. (4) “Average electric generating capacity” means the peak generating capacity of the facility divided by one of the following factors: (a) For wind facilities, 3.00; (b) For geothermal energy facilities, 1.11; or (c) For all other energy facilities, 1.00. (5) “Battery energy storage system” means an energy storage system that, other than for personal, noncommercial use: (a) Collects energy from the electric grid or an energy generation facility; (b) Uses rechargeable batteries to retain and store the energy for a period of time; and (c) Discharges the energy after storage to provide electricity when needed. (6) “Combustion turbine power plant” means a thermal power plant consisting of one or more fuel-fired combustion turbines and any associated waste heat combined cycle generators. (7) “Construction” means work performed on a site, excluding surveying, exploration or other activities to define or characterize the site, the cost of which exceeds $250,000. (8) “Council” means the Energy Facility Siting Council established under ORS 469.450. (9) “Department” means the State Department of Energy created under ORS 469.030. (10) “Director” means the Director of the State Department of Energy appointed under ORS 469.040. (11) “Electric utility” means persons, regulated electrical companies, people’s utility districts, joint operating agencies, electric cooperatives, municipalities or any combination thereof, engaged in or authorized to engage in the business of generating, supplying, transmitting or distributing electric energy. (12)(a) “Energy facility” means any of the following: (A) An electric power generating plant with a nominal electric generating capacity of 25 megawatts or more, including but not limited to: (i) Thermal power; (ii) Combustion turbine power plant; or (iii) Solar thermal power plant. (B) A nuclear installation as defined in this section. (C) A high voltage transmission line of more than 10 miles in length with a capacity of 230,000 volts or more to be constructed in more than one city or county in this state, but excluding: (i) Lines proposed for construction entirely within 500 feet of an existing corridor occupied by high voltage transmission lines with a capacity of 230,000 volts or more; (ii) Lines of 57,000 volts or more that are rebuilt and upgraded to 230,000 volts along the same right of way; and (iii) Associated transmission lines. (D) A solar photovoltaic power generation facility using more than: (i) 240 acres located on high-value farmland as defined in ORS 195.300; (ii) 2,560 acres located on land that is predominantly cultivated or that, if not cultivated, is predominantly composed of soils that are in capability classes I to IV, as specified by the National Cooperative Soil Survey operated by the Natural Resources Conservation Service of the United States Department of Agriculture; or (iii) 3,840 acres located on any other land. (E) A pipeline that is: (i) At least six inches in diameter, and five or more miles in length, used for the transportation of crude petroleum or a derivative thereof, liquefied natural gas, a geothermal energy form in a liquid state or other fossil energy resource, excluding a pipeline conveying natural or synthetic gas; (ii) At least 16 inches in diameter, and five or more miles in length, used for the transportation of natural or synthetic gas, but excluding: (I) A pipeline proposed for construction of which less than five miles of the pipeline is more than 50 feet from a public road, as defined in ORS 368.001; or (II) A parallel or upgraded pipeline up to 24 inches in diameter that is constructed within the same right of way as an existing 16-inch or larger pipeline that has a site certificate, if all studies and necessary mitigation conducted for the existing site certificate meet or are updated to meet current site certificate standards; or (iii) At least 16 inches in diameter and five or more miles in length used to carry a geothermal energy form in a gaseous state but excluding a pipeline used to distribute heat within a geothermal heating district established under ORS chapter 523. (F) A synthetic fuel plant which converts a natural resource including, but not limited to, coal or oil to a gas, liquid or solid product intended to be used as a fuel and capable of being burned to produce the equivalent of two billion Btu of heat a day. (G) A plant which converts biomass to a gas, liquid or solid product, or combination of such products, intended to be used as a fuel and if any one of such products is capable of being burned to produce the equivalent of six billion Btu of heat a day. (H) A storage facility for liquefied natural gas constructed after September 29, 1991, that is designed to hold at least 70,000 gallons. (I) A surface facility related to an underground gas storage reservoir that, at design injection or withdrawal rates, will receive or deliver more than 50 million cubic feet of natural or synthetic gas per day, or require more than 4,000 horsepower of natural gas compression to operate, but excluding: (i) The underground storage reservoir; (ii) The injection, withdrawal or monitoring wells and individual wellhead equipment; and (iii) An underground gas storage reservoir into which gas is injected solely for testing or reservoir maintenance purposes or to facilitate the secondary recovery of oil or other hydrocarbons. (J) An electric power generating plant with an average electric generating capacity of 50 megawatts or more if the power is produced from geothermal energy at a single energy facility or within a single energy generation area. (K) An electric power generating plant with an average electric generating capacity of 100 megawatts or more if the power is produced from wind energy at a single energy facility or within a single energy generation area. (b) “Energy facility” does not include a hydroelectric facility or an energy facility under paragraph (a)(A)(iii) or (D) of this subsection that is established on the site of a decommissioned United States Air Force facility that has adequate transmission capacity to serve the energy facility. (13) “Energy generation area” means an area within which the effects of two or more small generating plants may accumulate so the small generating plants have effects of a magnitude similar to a single generating plant of 35 megawatts average electric generating capacity or more. An “energy generation area” for facilities using a geothermal resource and covered by a unit agreement, as provided in ORS 522.405 to 522.545 or by federal law, shall be defined in that unit agreement. If no such unit agreement exists, an energy generation area for facilities using a geothermal resource shall be the area that is within two miles, measured from the electrical generating equipment of the facility, of an existing or proposed geothermal electric power generating plant, not including the site of any other such plant not owned or controlled by the same person. (14) “Extraordinary nuclear occurrence” means any event causing a discharge or dispersal of source material, special nuclear material or by-product material as those terms are defined in ORS 453.605, from its intended place of confinement off-site, or causing radiation levels off-site, that the United States Nuclear Regulatory Commission or its successor determines to be substantial and to have resulted in or to be likely to result in substantial damages to persons or property off-site. (15) “Facility” means an energy facility together with any related or supporting facilities. (16) “Geothermal reservoir” means an aquifer or aquifers containing a common geothermal fluid. (17) “Local government” means a city or county. (18) “Nominal electric generating capacity” means the maximum net electric power output of an energy facility based on the average temperature, barometric pressure and relative humidity at the site during the times of the year when the facility is intended to operate. (19) “Nuclear incident” means any occurrence, including an extraordinary nuclear occurrence, that results in bodily injury, sickness, disease, death, loss of or damage to property or loss of use of property due to the radioactive, toxic, explosive or other hazardous properties of source material, special nuclear material or by-product material as those terms are defined in ORS 453.605. (20) “Nuclear installation” means any power reactor, nuclear fuel fabrication plant, nuclear fuel reprocessing plant, waste disposal facility for radioactive waste, and any facility handling that quantity of fissionable materials sufficient to form a critical mass. “Nuclear installation” does not include any such facilities that are part of a thermal power plant. (21) “Nuclear power plant” means an electrical or any other facility using nuclear energy with a nominal electric generating capacity of 25 megawatts or more, for generation and distribution of electricity, and associated transmission lines. (22) “Person” means an individual, partnership, joint venture, private or public corporation, association, firm, public service company, political subdivision, municipal corporation, government agency, people’s utility district, or any other entity, public or private, however organized. (23) “Project order” means the order, including any amendments, issued by the State Department of Energy under ORS 469.330. (24)(a) “Radioactive waste” includes all material which is discarded, unwanted or has no present lawful economic use, and contains mined or refined naturally occurring isotopes, accelerator produced isotopes and by-product material, source material or special nuclear material as those terms are defined in ORS 453.605. (b) “Radioactive waste” does not include: (A) Materials identified by the council by rule as presenting no significant danger to the public health and safety. (B) Uranium mine overburden or uranium mill tailings, mill wastes or mill by-product materials as those terms are defined in Title 42, United States Code, section 2014, on June 25, 1979. (25) “Related or supporting facilities” means any structure, proposed by the applicant, to be constructed or substantially modified in connection with the construction of an energy facility, including associated transmission lines, reservoirs, storage facilities, intake structures, road and rail access, pipelines, barge basins, office or public buildings, and commercial and industrial structures. “Related or supporting facilities” does not include geothermal or underground gas storage reservoirs, production, injection or monitoring wells or wellhead equipment or pumps. (26) “Site” means any proposed location of an energy facility and related or supporting facilities. (27) “Site certificate” means the binding agreement between the State of Oregon and the applicant, authorizing the applicant to construct and operate a facility on an approved site, incorporating all conditions imposed by the council on the applicant. (28) “Thermal power plant” means an electrical facility using any source of thermal energy with a nominal electric generating capacity of 25 megawatts or more, for generation and distribution of electricity, and associated transmission lines, including but not limited to a nuclear-fueled, geothermal-fueled or fossil-fueled power plant, but not including a portable power plant the principal use of which is to supply power in emergencies. “Thermal power plant” includes a nuclear-fueled thermal power plant that has ceased to operate. (29) “Transportation” means the transport within the borders of the State of Oregon of radioactive material destined for or derived from any location. (30) “Underground gas storage reservoir” means any subsurface sand, strata, formation, aquifer, cavern or void, whether natural or artificially created, suitable for the injection, storage and withdrawal of natural gas or other gaseous substances. “Underground gas storage reservoir” includes a pool as defined in ORS 520.005. (31) “Utility” includes: (a) A person, a regulated electrical company, a people’s utility district, a joint operating agency, an electric cooperative, municipality or any combination thereof, engaged in or authorized to engage in the business of generating, transmitting or distributing electric energy; (b) A person or public agency generating electric energy from an energy facility for its own consumption; and (c) A person engaged in this state in the transmission or distribution of natural or synthetic gas. (32) “Waste disposal facility” means a geographical site in or upon which radioactive waste is held or placed but does not include a site at which radioactive waste used or generated pursuant to a license granted under ORS 453.635 is stored temporarily, a site of a thermal power plant used for the temporary storage of radioactive waste from that plant for which a site certificate has been issued pursuant to this chapter or a site used for temporary storage of radioactive waste from a reactor operated by a college, university or graduate center for research purposes and not connected to the Northwest Power Grid. As used in this subsection, “temporary storage” includes storage of radioactive waste on the site of a nuclear-fueled thermal power plant for which a site certificate has been issued until a permanent storage site is available by the federal government. [Formerly 453.305; 1977 c.796 §1; 1979 c.283 §1; 1981 c.587 §1; 1981 c.629 §2; 1981 c.707 §1; 1981 c.866 §1; 1991 c.480 §4; 1993 c.544 §3; 1993 c.569 §3; 1995 c.505 §6; 1995 c.551 §10; 1997 c.606 §1; 1999 c.365 §5; 2001 c.134 §2; 2001 c.683 §6; 2003 c.186 §28; 2013 c.320 §1; 2019 c.650 §1; 2021 c.38 §1; 2023 c.336 §3; 2024 c.25 §1; 2025 c.162 §1]
Administrative rules citing this section
- OAR 345-001-0010: Definitions — implements
- OAR 345-001-0200: Creation of an Energy Generation Area — implements
- OAR 345-001-0220: Energy Generation Areas — implements
- OAR 345-001-0250: Solar Photovoltaic Power Generation Facilities — implements
- OAR 345-030-0005: General — implements
- OAR 345-050-0020: Exempt Concentrations — implements
- OAR 345-050-0025: Exempt Quantities — implements
- OAR 345-076-0012: Rules That Apply to Nuclear Power Facilities — implements
- OAR 345-076-0020: Definitions — implements
- OAR 345-076-0050: Federal Waste Depository — implements
This rule cites
- ORS 469.300 — resolved
- 469.563 — resolved
- 469.590 — resolved
- 469.619 — resolved
- 469.930 — resolved
- 469.992 — resolved
- ORS 469.450 — resolved
- ORS 469.030 — resolved
- ORS 469.040 — resolved
- ORS 195.300 — resolved
- ORS 368.001 — resolved
- ORS chapter 523 — target_record_not_published
- ORS 522.405 — resolved
- 522.545 — resolved
- ORS 453.605 — resolved
- ORS 469.330 — resolved
- ORS 520.005 — resolved
- ORS 453.635 — resolved
Cited by
- ORS 30.490: Definitions for ORS 30.490 to 30.497.
- ORS 31.610: Liability of defendants several only; determination of defendants’ shares of monetary obligation; reallocation of uncollectible obligation; parties exempt from reallocation.
- ORS 215.213: Uses permitted in exclusive farm use zones in counties that adopted marginal lands system prior to 1993; rules.
- ORS 215.273: Applicability to thermal energy power plant siting determinations.
- ORS 215.274: Associated transmission lines necessary for public service; criteria; mitigating impact of facility.
- ORS 215.283: Uses permitted in exclusive farm use zones in nonmarginal lands counties; rules.
- ORS 215.446: Renewable energy facility; application; standards; notices.
- ORS 311.855: Definitions for ORS 311.850 to 311.870.
- ORS 453.307: Definitions for ORS 453.307 to 453.414.
- ORS 453.635: State Radiation Control Agency; duties; applicability of ORS 453.605 to 453.800.
- ORS 459.386: Definitions for ORS 459.386 to 459.405.
- ORS 466.365: Commission authority to establish sites for which notice is required; rulemaking; report to Legislative Assembly.
- ORS 466.605: Definitions for ORS 466.605 to 466.680.
- ORS 469.020: Definitions.
- ORS 469.030: State Department of Energy; duties.
- ORS 469.080: Energy resource information; subpoena power; depositions; limitations on obtaining information; protection from abuse.
- ORS 469.310: Policy.
- ORS 469.320: Site certificate required; exceptions.
- ORS 469.401: Energy facility site certificate; conditions; effect of issuance on state and local government agencies.
- ORS 469.403: Final order approving or rejecting application for site certificate or amendment; rehearing; appeal; judicial review vested in Supreme Court; stay of order.
- ORS 469.410: Energy facility site certificate applications filed or under construction prior to July 2, 1975; conditions of site certificate; monitoring programs.
- ORS 469.440: Grounds for revocation or suspension of certificates.
- ORS 469.450: Energy Facility Siting Council; appointment; confirmation; term; restrictions.
- ORS 469.460: Officers; meetings; compensation and expenses.
- ORS 469.470: Powers and duties; rules.
- ORS 469.490: Adoption of rules; determination of validity.
- ORS 469.503: Requirements for approval of energy facility site certificate; carbon dioxide emissions standard; offset funds; use of offset funds by qualifying organization; rules.
- ORS 469.504: Facility compliance with statewide planning goals; exception; amendment of local plan and land use regulations; conflicts; technical assistance; rules.
- ORS 469.505: Consultation with other agencies.
- ORS 469.540: Reductions or curtailment of operations for violation of safety standards; notice; time period for repairs; transport and disposal of radioactive materials.
- ORS 469.560: Records; public inspection; confidential information.
- ORS 469.561: Property insurance required; exceptions; filing of policy.
- ORS 469.594: Storage of high-level radioactive waste after expiration of license prohibited; continuing responsibility for storage; implementation agreements.
- ORS 469.601: Effect of ORS 469.595 on applications and applicants.
- ORS 469.619: State Department of Energy to make federal regulations available.
- ORS 469.992: Civil penalties.
- ORS 498.502: Actions that affect core area habitat; reports; orders; rules.
- ORS 541.898: Oregon Plan described; goals; elements; Governor to negotiate with federal government.
- ORS 757.522: Definitions for ORS 757.522 to 757.536.
- ORS 757.612: Requirements for public purpose expenditures; rules.
- ORS 757.720: Factors to be considered in approving plan; authority to establish plan; consultation with State Department of Energy.
- OAR 141-085-0595: Permit Requirements and Interagency Coordination for Department of Environmental Quality Approved Remedial Action, Corrections Facilities, Solid Waste Land Fills and Energy Facilities
- OAR 141-122-0050: Easement Application Review and Approval Process
- OAR 141-123-0050: Easement Application Review and Approval Process
- OAR 330-030-0015: Definitions
- OAR 330-075-0015: Definitions
- OAR 340-044-0005: Definitions
- OAR 340-130-0005: Definitions
- OAR 340-142-0005: Definitions as Used in This Division Unless Otherwise Specified
- OAR 340-271-0020: Definitions
- OAR 340-273-0020: Definitions
- OAR 345-001-0010: Definitions
- OAR 345-001-0250: Solar Photovoltaic Power Generation Facilities
- OAR 345-015-0110: Public Notice of a Notice of Intent
- OAR 345-015-0300: Request for Expedited Review of Small Capacity Facilities
- OAR 345-020-0011: Contents of a Notice of Intent
- OAR 345-021-0010: Contents of an Application
- OAR 345-022-0000: General Standard of Review
- OAR 345-022-0030: Land Use
- OAR 345-023-0030: System Reliability Rule for Electric Transmission Lines
- OAR 345-023-0040: Economically Reasonable Rule for Natural Gas Pipelines or Liquified Natural Gas Storage Facilities
- OAR 345-024-0503: Definitions for OAR 345-024-0500 to 345-024-0720
- OAR 345-026-0370: ISFSI Decommissioning Plan
- OAR 345-029-0100: Revocation or Suspension of Site Certificate
- OAR 345-050-0050: Definitions
- OAR 345-060-0001: Definitions
- OAR 345-070-0015: Definitions
- OAR 345-076-0010: Purpose
- OAR 345-076-0020: Definitions
- OAR 345-092-0025: Definitions
- OAR 635-415-0025: Implementation of Department Habitat Mitigation Recommendations
- OAR 660-023-0115: Greater Sage-Grouse
- OAR 660-033-0130: Minimum Standards Applicable to the Schedule of Permitted and Conditional Uses
- OAR 837-085-0040: Definitions
- OAR 837-090-1015: Definitions
- OAR 918-311-0070: Use and Content of a Written Request to Reconnect an Electrical Installation
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors469.html