ORS 374.305: Necessity of permission to build on rights of way.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
(1) A person may not place, build or construct on the right of way of any state highway or county road, any approach road, structure, pipeline, ditch, cable or wire, or any other facility, thing or appurtenance, or substantially alter any such facility, thing or appurtenance or change the manner of using any such approach road without first obtaining written permission from the Department of Transportation with respect to state highways or the county court or board of county commissioners with respect to county roads. In reviewing or granting an application for written permission, the department or a county court or board of county commissioners may not discriminate against or favor a renewable energy facility. (2) After written notice of not less than 10 days to the permittee and an opportunity for a hearing, the department with respect to crossings over a state highway and the county court or board of county commissioners with respect to crossings over a county road may abolish any crossing at grade by a private road or may alter or change any private road crossing when the public safety, public convenience and the general welfare require the alteration or change. [Amended by 1955 c.424 §1; 1957 c.323 §1; 1967 c.497 §1; 2011 c.330 §3; 2023 c.336 §2]
Administrative rules citing this section
- OAR 734-051-1010: Authority for Rules — General Provisions — implements
- OAR 734-051-1020: Purpose and Intent of Rules — implements
- OAR 734-051-1030: Administration of Rules — implements
- OAR 734-051-1040: Relationship to Local Jurisdiction Rules and Regulations — implements
- OAR 734-051-1050: Procedure to Obtain a Permit to Construct or Modify a Public Approach — implements
- OAR 734-051-1060: Delegation of Permit Authority to Local Jurisdiction — implements
- OAR 734-051-1070: Definitions — implements
- OAR 734-051-2010: Rights of Access — General Provisions — implements
- OAR 734-051-2020: Grants of Access — implements
- OAR 734-051-2030: Indentures of Access — implements
- OAR 734-051-3010: Administration of Private Approaches — Permit for Private Approach — implements
- OAR 734-051-3015: Presumption of Written Permission for an Existing Private Connection — implements
- OAR 734-051-3020: Change of Use of a Private Connection — implements
- OAR 734-051-3030: Application Requirements for State Highway Private Approach — implements
- OAR 734-051-3040: Private Approach Permit Application Review, Approvals and Timelines — implements
- OAR 734-051-3050: Deviations from Approach Spacing, Sight Distance, and Channelization Standards for a Private Approach — implements
- OAR 734-051-3060: Pre-Decision Collaborative Discussion for Highway Approach Permit Applications — implements
- OAR 734-051-3070: Mitigation Measures — implements
- OAR 734-051-3080: Post-Decision Review Processes — implements
- OAR 734-051-3090: Post-Decision Collaborative Discussion — implements
- OAR 734-051-3100: Access Management Dispute Review Board — implements
- OAR 734-051-3110: Contested Case Hearing Process — implements
- OAR 734-051-4010: Access Management Standards for Approaches — General Provisions — implements
- OAR 734-051-4020: Standards and Criteria for Approval of Private Approaches — implements
- OAR 734-051-4030: Benefit to the State Highway System — implements
- OAR 734-051-4040: Temporary Approaches — implements
- OAR 734-051-4050: Special Use Approaches — implements
- OAR 734-051-5010: Approach Design and Construction — Design of Approaches — implements
- OAR 734-051-5020: Issuance of Construction Permits — implements
- OAR 734-051-5030: Construction of Approaches — implements
- OAR 734-051-5040: Effective Period of Construction Permits — implements
- OAR 734-051-5050: Responsibility for Costs of Construction of Approaches — implements
- OAR 734-051-5060: Liability, Insurance and Bonding Requirements — implements
- OAR 734-051-5070: Review Procedure for Modifying a Construction Permit — implements
- OAR 734-051-5080: Issuance of a Permit to Operate, Maintain and Use an Approach — implements
- OAR 734-051-5090: Maintenance of Approaches — implements
- OAR 734-051-5100: Effective Period of Permit to Operate, Maintain and Use an Approach — implements
- OAR 734-051-5110: Revocation of Permits and Removal of Approaches — implements
- OAR 734-051-5120: Access Management in Project Delivery — implements
- OAR 734-051-6010: Remedies in Closure of Approaches — Authority and Purpose of OAR 734-051-6010 through 734-051-6060 — implements
- OAR 734-051-6020: Definitions — implements
- OAR 734-051-6030: Offer of Remedies — implements
- OAR 734-051-6040: Procedure for Resolving Claims — implements
- OAR 734-051-6050: Appraisals — implements
- OAR 734-051-6060: Conditions of Agreement — implements
- OAR 734-051-6070: Delegation — implements
- OAR 734-051-7010: Access Management in Highway Facility Plans — implements
- OAR 734-055-0005: Scope — implements
- OAR 734-055-0010: Definition of Terms — implements
- OAR 734-055-0015: Permit Application Procedure — implements
- OAR 734-055-0020: Allocation of Cost — implements
- OAR 734-055-0025: Liability and Control — implements
- OAR 734-055-0035: Insurance and Bond — implements
- OAR 734-055-0040: Construction and Location Details — implements
- OAR 734-055-0045: Removal, Relocation or Repair — implements
- OAR 734-055-0050: Maintenance and Operation — implements
- OAR 734-055-0055: Other Agencies — implements
- OAR 734-055-0060: Effective Period of Permit — implements
- OAR 734-055-0070: Conformance with Regulations and Industry Codes — implements
- OAR 734-055-0080: Freeways — implements
- OAR 734-055-0090: Specific Construction Details — implements
- OAR 734-055-0100: Permit Allowing Open Cut of Road Surface — implements
- OAR 734-055-0110: Special “X” Permits — implements
- OAR 734-057-0010: City/County Entrance Program — implements
- OAR 734-057-0020: Beautification of Highway Right of Way — implements
This rule cites
No citations extracted.
Cited by
- ORS 374.307: Removal or repair of installation constructed without permission.
- ORS 374.309: County permits; rules.
- ORS 374.325: Effect of ORS 374.305 to 374.325.
- ORS 374.330: Prior status preserved.
- ORS 374.990: Penalty for violation of ORS 374.305 or rule adopted under ORS 374.309 or 374.310.
- ORS 381.310: Port of Hood River bridge projects; definitions; agreements; evaluation of proposals.
- OAR 734-051-5110: Revocation of Permits and Removal of Approaches
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors374.html