ORS 280.410: Definitions for ORS 280.410 to 280.485.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
As used in ORS 280.410 to 280.485 unless the context requires otherwise: (1)(a) “Economic development project” includes any properties, real or personal, used or useful in connection with a revenue producing enterprise. (b) “Economic development project” also includes multiple unit residential housing development, including low income single room occupancy housing, on land having an assessed valuation of $8 per square foot or more on September 13, 1975, land within a designated urban renewal or redevelopment area formed pursuant to ORS chapter 457, or projects which benefit low or moderate income tenants, or address slum and blight as defined by the 1974 Housing and Community Development Act. (c) “Economic development project” shall not include any facility or facilities designed primarily for the operation, transmission, sale or distribution of electrical energy. (2) “Eligible project” means an economic development project found by the city to meet standards adopted pursuant to ORS 280.410 to 280.485. (3) “City” means any city with a population of 70,000 or more. (4) “Cost” as applied to any project includes: (a) The cost of construction and reconstruction; (b) The cost of acquisition of property, including rights in land and other property, both real and personal and improved and unimproved and the cost of site improvements; (c) The cost of demolishing, removing or relocating any buildings or structures on lands so acquired, including the cost of acquiring any lands to which the buildings or structures may be moved or relocated; (d) The cost of eligible machinery and equipment and related financing charges; (e) The cost of engineering and architectural surveys, plans and specifications; (f) The cost of financing charges and interest prior to and during construction, and if deemed advisable by the city for a period not exceeding one year after completion of construction; and (g) The cost of consultant and legal services, other expenses necessary or incident to determining the feasibility or practicability of constructing a project, administrative and other expenses necessary or incident to the construction of the project, including, but not limited to, costs of relocation and moving expenses according to a project plan developed by the city, and the financing of the construction of the project thereof, including reimbursement to any state or other governmental agency or any lessee of such project for the expenditures made with the approval of the city that would be costs of the project under ORS 280.410 to 280.485 had they been made directly by the city. (5) “Low income” means an income not exceeding 80 percent of the prevailing median income, based on family size, within the city. [1977 c.772 §2; 1979 c.865 §1; 1981 c.368 §1; 1991 c.560 §1; 2003 c.286 §1]
This rule cites
- ORS 280.410 — resolved
- 280.485 — resolved
- ORS chapter 457 — target_record_not_published
Cited by
- ORS 280.415: Legislative findings.
- ORS 280.420: Eligibility of projects for financing; standards; ordinance for applications.
- ORS 280.422: Exception to eligibility standards.
- ORS 280.424: Bond-financed single room occupancy rental housing to conform with federal law.
- ORS 280.425: City powers concerning property.
- ORS 280.430: Contractual powers of city; requirements for project loans and leases.
- ORS 280.435: Limitation on city power.
- ORS 280.440: Authority to issue revenue bonds.
- ORS 280.445: Factors considered in determining whether to issue bonds.
- ORS 280.450: Issuance of bonds.
- ORS 280.455: Administrative expenses.
- ORS 280.460: Refunding bonds.
- ORS 280.465: Validity of bonds.
- ORS 280.470: Covenants in bonds allowed.
- ORS 280.475: Limitations of bonds; recitals.
- ORS 280.480: Powers and rights of bondholders.
- ORS 280.485: Effect of ORS 280.410 to 280.485 on powers of city.
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors280.html