OAR 860-084: Solar Photovoltaic Programs

38 rules in Division 084, Chapter 860 (Public Utility Commission).

  1. OAR 860-084-0000: Scope and Applicability of Solar Photovoltaic Programs
  2. OAR 860-084-0010: Definitions for Solar Photovoltaic Pilot Programs
  3. OAR 860-084-0070: Renewable Energy Certificates and Compliance with the Renewable Portfolio Standards
  4. OAR 860-084-0100: Solar Photovoltaic Pilot Programs
  5. OAR 860-084-0120: Systems Eligible for Enrollment in Pilot Programs
  6. OAR 860-084-0130: Ownership and Installation
  7. OAR 860-084-0140: Assignment of Payments
  8. OAR 860-084-0150: Solar Photovoltaic Pilot Capacity Limit
  9. OAR 860-084-0160: Measurement of Capacity under the Solar Photovoltaic Pilot Program
  10. OAR 860-084-0170: Distributing Solar Photovoltaic Pilot Capacity by Electric Company
  11. OAR 860-084-0180: Distributing Electric Company Capacity Limit by Allocation Period
  12. OAR 860-084-0190: Distributing Capacity by System Size
  13. OAR 860-084-0195: Mechanisms for Reserving Capacity
  14. OAR 860-084-0200: Capacity Reservation, Timing, and Volumetric Incentive Rates
  15. OAR 860-084-0210: Capacity Reservation, Timing, and Duration
  16. OAR 860-084-0220: Capacity Availability
  17. OAR 860-084-0230: Application for Capacity Reservation
  18. OAR 860-084-0240: Standard Contracts
  19. OAR 860-084-0250: Billing and Payment Requirements
  20. OAR 860-084-0260: Interconnection Requirements for Solar Photovoltaic Pilot Program
  21. OAR 860-084-0270: Authorization to Interconnect
  22. OAR 860-084-0280: Interconnection Cost Responsibility
  23. OAR 860-084-0300: Insurance
  24. OAR 860-084-0310: Level 1 System Interconnection Review
  25. OAR 860-084-0320: Level 2 System Interconnection Review
  26. OAR 860-084-0330: Level 3 System Interconnection Review
  27. OAR 860-084-0340: Installation, Operation, Maintenance, and Testing of Contracted Systems
  28. OAR 860-084-0350: Requirements after Approval of a Solar Photovoltaic Interconnection
  29. OAR 860-084-0360: Volumetric Incentive Rates and Payments – Net Metering Option
  30. OAR 860-084-0365: Volumetric Incentive Rate Bidding Option
  31. OAR 860-084-0370: Resource Value
  32. OAR 860-084-0380: Cost Recovery and Rate Impacts
  33. OAR 860-084-0390: Cost Recovery Mechanism
  34. OAR 860-084-0400: Data Collection
  35. OAR 860-084-0420: Compliance with Pilot Program Requirements
  36. OAR 860-084-0430: Data Availability
  37. OAR 860-084-0440: Pilot Program Overhead
  38. OAR 860-084-0450: Reports to the Legislature