OAR 918-500-0410: Inspection Request
Edition: Current OARD snapshotEffective: 2010-04-01Last verified: 2026-09-07
(1) Requests for inspection from a manufacturer must: (a) Be made to the division by mail, electronic mail, phone, or fax transmittal, and received at least five working days prior to the desired time of inspection; and (b) Indicate the serial number of the manufactured dwelling to be inspected. Inspection fees must be paid by the manufacturer within 30 days of the billing date. (2) Requests for inspection from a dealer must: (a) Be made on forms supplied by the division, and received at least five working days prior to the desired date of inspection; (b) Indicate the location, make, model, and serial number of the manufactured dwelling; and (c) Be accompanied by the minimum inspection fees required by OAR 918-500-0100 and 918-500-0110. All additional inspection fees are payable upon completion of each inspection. (3) All work must be accessible for inspection by the division. (4) Occupancy may not prevent the physical inspection of manufactured dwelling alterations, repairs, or installations.
Official history and status
Statutory/Other Authority: ORS 446.176 & 446.230
Statutes/Other Implemented: ORS 446.155
History: BCD 1-2010, f. 3-1-10, cert. ef. 4-1-10 BCD 22-1998, f. 11-9-98, cert. ef. 1-1-99 BCD 19-1995, f. 12-15-95, cert. ef. 1-1-96 BCD 2-1994, f. 1-14-94, cert. ef. 2-1-94 BCA 10-1992, f. 6-15-92, cert. ef. 7-1-92 BCA 1-1990, f. & cert. ef. 1-2-90
This rule cites
- OAR 918-500-0100 — resolved
- 918-500-0110 — resolved
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/