ORS 757.710: Emergency curtailment plan required; credits for weatherization or alternate energy devices.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
(1) Any person, as defined in ORS 758.400, engaged in the sale or resale of electricity or natural or synthetic gas in this state shall present for approval by the Public Utility Commission a plan for curtailment of electrical or gas load in the event of any predictable circumstance that may jeopardize prolonged continuity of service. Utility plans shall be submitted in such form and within such time limits as the commission shall specify. (2) Utility plans may provide for a credit against future curtailment for a customer who has already accomplished a reduction in demand for the utility’s service by installing an alternative energy device or by weatherization or other installed conservation measures equivalent to the proposed level of curtailment. Where the level of curtailment exceeds the demand reduction produced, by the conservation measures or installed alternative energy device of the customer, the utility plan may provide for credit against the level of curtailment ordered to the extent of the demand reduction produced by the conservation measure or alternate energy device. (3) The commission shall approve the feature of any plan concerning such credit against curtailment to the extent of the demand reduction produced and shall not penalize either the utility or the customer, in the event of a curtailment order, under ORS 757.720 for the amount of reduced demand. [1973 c.309 §2; 1975 c.606 §10; 1979 c.355 §1]
This rule cites
- ORS 758.400 — resolved
- ORS 757.720 — resolved
Cited by
- ORS 176.795: Actions authorized by proclamation under ORS 176.785.
- ORS 469.030: State Department of Energy; duties.
- ORS 469.080: Energy resource information; subpoena power; depositions; limitations on obtaining information; protection from abuse.
- ORS 469.410: Energy facility site certificate applications filed or under construction prior to July 2, 1975; conditions of site certificate; monitoring programs.
- ORS 757.720: Factors to be considered in approving plan; authority to establish plan; consultation with State Department of Energy.
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors757.html