ORS 701.312: Additional grounds for placing contractor on probation.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
Notwithstanding the conditions specified for probation in ORS 701.102 (3), the Construction Contractors Board may place a contractor on probation as provided in ORS 701.102 (3) if the contractor offers to perform a home improvement, accepts a deposit of more than 50 percent of the total contract price and: (1) Fails to perform diligently and in accordance with the contract specifications the home improvement for which the contractor received the deposit; or (2) Fails to perform the home improvement for which the contractor received the deposit and fails to return the deposit within 10 days after a reasonable demand to return the deposit. [2010 c.77 §6]