ORS 479.870: Electrical and Elevator Board to prescribe uniform fee calculation and permit format; review; rules.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
(1) The Electrical and Elevator Board shall provide by rule for a statewide uniform method of calculating permit fees and a standardized permit application format. (2) Notwithstanding the provisions of subsection (1) of this section, the board shall provide by rule for a separate limited energy electrical activity permit and the conditions that apply to the permit. (3) The board shall adopt rules setting standards for timely review, personnel to conduct review and other plan review requirements. [1989 c.591 §2; 1991 c.529 §9; subsection (3) enacted as 1991 c.439 §2; 2001 c.728 §3]
Administrative rules citing this section
- OAR 918-309-0010: Electrical Permit Form and Format — implements
- OAR 918-309-0070: Miscellaneous — authority
- OAR 918-309-0410: Renewable Electrical Energy Bulk Labels — implements
- OAR 918-309-0410: Renewable Electrical Energy Bulk Labels — authority
- OAR 918-311-0010: Electrical Plan Review Rules — implements
- OAR 918-311-0010: Electrical Plan Review Rules — authority
- OAR 918-311-0020: Time Limit for Electrical Plan Review — implements
- OAR 918-311-0020: Time Limit for Electrical Plan Review — authority
- OAR 918-311-0040: Electrical Plan Review for Complex Structures — implements
- OAR 918-311-0040: Electrical Plan Review for Complex Structures — authority
- OAR 918-311-0050: Standards for Electrical Plans Review — implements
- OAR 918-311-0050: Standards for Electrical Plans Review — authority
- OAR 918-311-0055: Fees for Electrical Plan Reviews Performed by Building Codes Division — implements
- OAR 918-311-0055: Fees for Electrical Plan Reviews Performed by Building Codes Division — authority
This rule cites
No citations extracted.
Cited by
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors479.html