ORS 446.252: Installation permit required.
Edition: 2025 EditionEffective: 2026-01-01Last verified: 2026-09-07
A person may not install a manufactured dwelling or an accessory building or structure without first obtaining from the Department of Consumer and Business Services or a municipality as provided under ORS 446.250 all permits necessary for installing the manufactured dwelling or the accessory building or structure on a lot. [1989 c.1017 §2; 1995 c.251 §6; 1997 c.205 §4; 2019 c.422 §10]
This rule cites
- ORS 446.250 — resolved
Cited by
Official source: https://www.oregonlegislature.gov/bills_laws/ors/ors446.html