OAR 918-515-0490: Limited Skirting Installer Responsibilities to Consumer
Edition: Current OARD snapshotEffective: 2010-04-01Last verified: 2026-09-07
A limited skirting installer must, at a minimum: (1) Install the skirting, underfloor skirting access, underfloor ventilation, and underfloor dryer and range exhaust ducts and terminations through the skirting when required; (2) Ensure all work performed is in compliance with the Oregon Manufactured Dwelling Installation Specialty Code; (3) Affix a certification tag to each manufactured dwelling or cabana on which skirting has been installed. (4) Complete all reporting and application forms required by OAR 918-515-0300, 918-515-0340, and 918-515-0360. (5) Notify the division or municipality upon completion of the installation work; and (6) Correct all nonconforming skirting installations within 30 days of receipt of a correction notice from the division or municipality. [Publications: Publications referenced are available from the agency.]
Official history and status
Statutory/Other Authority: ORS 183.325 - 410, 446.400, 446.405, 455.130 & 455.610
Statutes/Other Implemented: ORS 446.400 & 446.405
History: BCD 1-2010, f. 3-1-10, cert. ef. 4-1-10 BCD 22-1998, f. 11-9-98, cert. ef. 1-1-99 BCD 1-1997, f. 2-24-97, cert. ef. 4-1-97 BCD 19-1995, f. 12-15-95, cert. ef. 1-1-96
This rule cites
- OAR 918-515-0300 — resolved
- 918-515-0340 — resolved
Cited by
Official source: https://secure.sos.state.or.us/oard/