OAR 918-308-0300: Review of Municipality Program
Edition: Current OARD snapshotEffective: 2008-10-01Last verified: 2026-09-07
(1) The division shall conduct a comprehensive review of each municipality delegated administration of the electrical program at least every five years. (2) A comprehensive review shall be conducted by a minimum team of: (a) One local building official; (b) One electrical contractor or contractor's representative; (c) Division chief electrical inspector or Oregon Electrical Specialty Code inspector if the chief inspector is unable to serve; and (d) One division representative; (e) Optionally, a general contractor registered with the Construction Contractors Board, if nominated by the municipality involved; (f) Optionally, additional persons, depending on the size and complexity of the municipality involved, as determined and selected by the division. (3) A single-purpose review shall be conducted by the division chief electrical inspector or designee and others selected by the division if the operations of the municipality are at variance with its approved operating plan. [Publications: Publications referenced are available from the agency.]
Official history and status
Statutory/Other Authority: ORS 479.730
Statutes/Other Implemented: ORS 479.855, 455.148 & 455.150
History: BCD 23-2008, f. 9-30-08, cert. ef. 10-1-08 BCD 19-1996, f. 9-17-96, cert. ef. 10-1-96, Renumbered from 918-303-0010 BCA 21-1993, f. 10-5-93, cert. ef 12-1-93 BCA 11-1988, f. & cert. ef. 7-20-88
This rule cites
No citations extracted.
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/