OAR 918-305-0510: Standards for Electrified Fixed Guideway Railway Plan Review
Edition: Current OARD snapshotEffective: 2000-04-01Last verified: 2026-09-07
A person performing electrical plan review shall be certified under OAR 918-311-0030 and do the following as a minimum when performing plan reviews: (1) Load Calculations. Check load calculations for appropriateness, completeness and accuracy. (2) Equipment. Check and determine if the equipment is: (a) Suitable for the environment; and (b) Properly sized and rated to meet the minimum code requirements. (3) Service and Feeder. Check service and feeder installations for code compliance related to: (a) Wiring method; (b) Conduit and box fill; (c) Conductor size and ampacity rating; (d) Clearances; (e) Locations; (f) Accessibility; and (g) Service grounding conductor size.
Official history and status
Statutory/Other Authority: ORS 479.950
Statutes/Other Implemented: ORS 479.950
History: BCD 7-2000, f. 3-15-00, cert. ef. 4-1-00
This rule cites
- OAR 918-311-0030 — target_record_not_published
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/