OAR 918-225-0620: Bulk Rate Permits
Edition: Current OARD snapshotEffective: 2018-07-01Last verified: 2026-09-07
(1) Bulk rate permits may be granted if there is a quantity of either six (6) or more boilers or six (6) or more pressure vessels at the same location. (2) To obtain bulk rate permits, the owner or user must make a written request to the division at least 30 days before the expiration of existing operating permits. (3) If a bulk rate site requires two or more inspections during an inspection cycle, the division may rescind bulk rate permits and charge the full operating permit fees, as provided in Table 3-B. Inspection cycles are listed in OAR 918-225-0570 Table 1-B. [NOTE: Table referenced is not included in rule text.] [ED. NOTE: To view attachments referenced in rule text, click here to view rule.]
Official history and status
Statutory/Other Authority: ORS 480.600
Statutes/Other Implemented: ORS 480.600
History: BCD 12-2018, amend filed 06/21/2018, effective 07/01/2018 BCD 31-2011, f. 12-30-11, cert. ef. 1-1-12 BCD 10-2009, f. 12-30-09, cert. ef. 1-1-10 BCA 36-1993, f. 12-30-93, cert. ef. 1-1-94, Renumbered from 918-225-0120 DC 17-1982, f. 7-31-72, cert. ef. 8-15-72, Renumbered from 814-025-0050
This rule cites
- OAR 918-225-0570 — resolved
Cited by
Official source: https://secure.sos.state.or.us/oard/