OAR 740-105-0210: Methods of Preheating
Edition: Current OARD snapshotEffective: 1996-03-14Last verified: 2026-09-07
(1) Preheating may be accomplished by flame or electrical resistance method. (2)(a) Preheat parameters. (b) All preheating performed under the conditions of this procedure must comply with the following preheat parameters. (A) In cases where no preheat is specified, and the ambient temperature is below 32°F, the base metal must be preheated to at least 70°F prior to welding and/or tack welding. (B) Preheating will be done at least three (3) inches laterally and in advance of the welding. (C) Welding will not be performed on surfaces that are wet or under high wind conditions without proper weather protection.
Official history and status
Statutory/Other Authority: ORS 183.335, 823.011, 825.210 & 825.252
Statutes/Other Implemented: ORS 825.210 & 825.252
History: MCT 3-1996, f. & cert. ef. 3-14-96, Renumbered from 860-066-0111 PUC 16-1993, f. & cert. ef. 8-19-93 (Order No. 93-1157)
This rule cites
No citations extracted.
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/