OAR 734-082-0050: Load Length
Edition: Current OARD snapshotEffective: 2025-03-13Last verified: 2026-09-07
(1) Variance permits are required for non-divisible loads that exceed legal length specified in ORS Chapter 818. (2) Overlength permits will not be valid if overlength is caused by multiple items placed end to end, or overlapping unless specifically stated on the permit as authorized by statute or rule. (3) Items joined (by spot weld, tack weld, bolting, strapping, etc.) to facilitate transport, shall be considered to be divisible loads and not eligible for overlength permits.
Official history and status
Statutory/Other Authority: ORS 184.619 & 818.200
Statutes/Other Implemented: ORS 818.210, 818.220 & 818.225
History: DOD 1-2025, amend filed 03/13/2025, effective 03/13/2025 TO 3-2000, f. & cert. ef. 2-11-00
This rule cites
- ORS Chapter 818 — target_record_not_published
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/