OAR 734-020-0490: Conditions of Approval
Edition: Current OARD snapshotEffective: 1999-12-17Last verified: 2026-09-07
The following conditions apply when installation of a traffic signal has been approved: (1) A traffic signal warrant shall be met within three years after construction when a traffic signal is constructed as part of a roadway improvement project. (2) A traffic signal warrant shall be met within one month after the traffic signal is put into operation when a traffic signal is being constructed to accommodate additional traffic from a public or private development. If it is projected that a warrant will be met at a later time, operation of the traffic signal should be correspondingly delayed. (3) All approaches to a traffic signal controlled intersection must be signalized, unless a traffic engineering investigation shows that signalizing a minor public or private road is not justified.
Official history and status
Statutory/Other Authority: ORS 184.616, 184.619, 366.205 & 810.200
Statutes/Other Implemented: ORS 810.200 & 810.210
History: TO 5-1999, f. & cert. ef. 12-17-99
This rule cites
No citations extracted.
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/