OAR 690-220-0140: Method of Placement of Concrete or Cement Grout
Edition: Current OARD snapshotEffective: 2001-11-15Last verified: 2026-09-07
Concrete or cement grout used as a sealing material in abandonment operations shall be introduced at the bottom of the well or required sealing interval and placed progressively upward to the top of the well. All such sealing materials shall be placed by the use of a grout pipe or by dump bailer in order to avoid segregation or dilution of the sealing materials.
Official history and status
Statutory/Other Authority: ORS 183, 536, 537 & 540
Statutes/Other Implemented: ORS 183, 536, 537 & 540
History: WRD 7-2001, f. & cert. ef. 11-15-01 WRD 13-1986, f. 10-7-86, cert. ef. 11-1-86, Renumbered from 690-063-0040 WRD 9-1978, f. 12-12-78, cert. ef. 1-1-79 WRD 3, f. & cert. ef. 2-18-77