OAR 690-215-0006: Well Alterations
Edition: Current OARD snapshotEffective: 2009-01-02Last verified: 2026-09-07
(1) Well alterations as defined in OAR 690-200-0050(7) shall be performed by a licensed Water Supply Well Constructor, or a landowner with a Landowner’s Well Construction Permit and bond. (2) Water Supply Well Constructors or a permitted and bonded landowner shall record the following data, if available, on the Water Supply Well Report as required under OAR 690-205-0210 before completing alteration work on a well: (a) Pre-alteration static water level and date taken. (b) Pre-alteration casing diameter. (c) Pre-alteration casing gauge. (d) Pre-alteration well depth. (e) Pre-alteration seal material. (3) Well alteration work shall be completed in accordance with OAR 690-215. The Water Supply Well Constructor shall only be responsible for the alteration work they performed under OAR 690-215.
Official history and status
Statutory/Other Authority: ORS 536.090 & 537.505 - 537.795
History: WRD 3-2008, f. 12-22-08, cert. ef. 1-2-09
This rule cites
- OAR 690-200-0050 — resolved
- OAR 690-205-0210 — resolved
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/