OAR 635-500-6750: White Sturgeon
Edition: Current OARD snapshotEffective: 2017-01-25Last verified: 2026-09-07
(1) Transition Period (2013–January 31, 2017). (a) In years when retention is allowed, allocate 90% of the harvestable surplus downstream from Bonneville Dam for use in non-tribal fisheries and hold 10% in reserve as an additional conservation buffer above the maximum harvest rate allowed in Oregon’s white sturgeon conservation plan. (b) Assign 80% of the white sturgeon available for harvest to the recreational fishery. (c) Assign 20% to off-channel and mainstem commercial fisheries. (2) Long Term (February 1, 2017 and Beyond). (a) In years when retention is allowed, allocate 90% of the harvestable surplus downstream from Bonneville Dam for use in non-tribal fisheries and hold 10% in reserve as an additional conservation buffer above the maximum harvest rate allowed in Oregon’s white sturgeon conservation plan. (b) Assign 80% of the white sturgeon available for harvest to the recreational fishery. (c) Assign the balance (20%) to off-channel and mainstem commercial fisheries.
Official history and status
Statutory/Other Authority: ORS 496.138, 496.146 & 506.119
Statutes/Other Implemented: ORS 506.109 & 506.129
History: DFW 4-2017, f. & cert. ef. 1-25-17 DFW 147-2016, f. 12-7-16, cert. ef. 12-15-16 DFW 152-2012, f. 12-27-12, cert. ef. 1-1-13
This rule cites
No citations extracted.
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/