OAR 340-245-9020: Colored Art Glass Manufacturing Facility Rules; Permit Required
Edition: Current OARD snapshotEffective: 2018-11-16Last verified: 2026-09-07
(1) Not later than December 1, 2016, if located within the Portland AQMA, and not later than April 1, 2017, if located outside the Portland AQMA, all CAGMs not otherwise subject to a permitting requirement must apply for a permit under OAR 340-216-8020 Table 2, Part B, category #84. (2) A CAGM that applies for a permit on or before the required date is not in violation of OAR 340-216-0020(3). (3) CAGMs constructed after September 1, 2016 must obtain a permit prior to construction. NOTE: This rule was moved verbatim from OAR 340-244-9020 and renumbered.
Official history and status
Statutory/Other Authority: ORS 468.020, 468A.025 & 468A.040
Statutes/Other Implemented: 468A.025 & 468A.040
History: DEQ 197-2018, adopt filed 11/16/2018, effective 11/16/2018
This rule cites
- OAR 340-216-8020 — resolved
- OAR 340-216-0020 — resolved
- This rule — target_record_not_published
- OAR 340-244-9020 — target_record_not_published
Cited by
Official source: https://secure.sos.state.or.us/oard/