OAR 340-244-0242: Gasoline Dispensing Facilities: GDF 4
Edition: Current OARD snapshotEffective: 2024-03-25Last verified: 2026-09-07
(1) The owner or operator of a GDF 4 as described in OAR 340-244-0234(4) must comply with all applicable requirements under OAR 340-244-0241; (2) The owner or operator of a GDF 4 which commenced construction on or after July 1, 2024 must comply with the following for each gasoline storage tank with 250 gallon or greater capacity: (a) Each storage tank must be dual-point; and (b) Install an Enhanced Vapor Recovery system on each storage tank and ECO nozzles on each gasoline dispenser under OAR 340-244-0246. (3) The owner or operator of a GDF 4 which commenced construction before July 1, 2024 without a Stage II vapor recovery system must comply with the following: (a) Each new, replaced, or reconstructed gasoline storage tank with 250 gallon or greater capacity must be dual-point and install an Enhanced Vapor Recovery system under OAR 340-244-0246; and (b) The owner or operator must install ECO nozzles on all gasoline dispensers at the time any gasoline storage tank is required to install an Enhanced Vapor Recovery system. (4) The owner or operator of a GDF 4 which commenced construction before July 1, 2024 and which has a complete Stage II vapor recovery system must comply with OAR 340-244-0247. [NOTE: This rule is included in the State of Oregon Clean Air Act Implementation Plan that EQC adopted under OAR 340-200-0040 only for affected sources in the Portland-Vancouver, Medford-Ashland, and Salem-Keizer Area Transportation Study air quality management areas and all of Clackamas, Multnomah, and Washington counties.]
Official history and status
Statutory/Other Authority: ORS 468.020 & ORS 468A.025
Statutes/Other Implemented: ORS 468A.025
History: DEQ 4-2024, amend filed 03/25/2024, effective 03/25/2024 DEQ 13-2019, amend filed 05/16/2019, effective 05/16/2019 DEQ 149-2018, minor correction filed 04/11/2018, effective 04/11/2018 DEQ 7-2015, f. & cert. ef. 4-16-15 DEQ 4-2013, f. & cert. ef. 3-27-13 DEQ 1-2011, f. & cert. ef. 2-24-11 DEQ 8-2009, f. & cert. ef. 12-16-09 DEQ 15-2008, f. & cert. ef 12-31-08
This rule cites
- OAR 340-244-0234 — resolved
- OAR 340-244-0241 — resolved
- OAR 340-244-0246 — resolved
- OAR 340-244-0247 — resolved
- This rule — target_record_not_published
- OAR 340-200-0040 — resolved
Cited by
Official source: https://secure.sos.state.or.us/oard/