OAR 340-240-0420: Lakeview Urban Growth Area: Requirement for Operation and Maintenance Plans
Edition: Current OARD snapshotEffective: 2015-04-16Last verified: 2026-09-07
(1) With the exception of basic and general permit holders, a permit holder must prepare and implement operation and maintenance plans for non-fugitive sources of particulate matter. (2) The purposes of the operation and maintenance plans are to: (a) Reduce the number of upsets and breakdowns in particulate control devices; (b) Reduce the duration of upsets and downtimes; and (c) Improve the efficiency of control devices during normal operations. (3) The operation and maintenance plans must consider, but not be limited to, the following: (a) Personnel training in operation and maintenance; (b) Preventative maintenance procedures, schedule and records; (c) Logging of the occurrence and duration of all upsets, breakdowns and malfunctions which result in excessive emissions; (d) Routine follow-up evaluation of upsets to identify the cause of the problem and changes needed to prevent a recurrence; (e) Periodic source testing of pollution control units as required by a permit; (f) Inspection of internal wear points of pollution control devices during scheduled shutdowns; and (g) Inventory of key spare parts. NOTE: This rule is included in the State of Oregon Clean Air Act Implementation Plan that EQC adopted under OAR 340-200-0040.
Official history and status
Statutory/Other Authority: ORS 468.020, 468A.025 & 468A.050
Statutes/Other Implemented: ORS 468.020, 468A.025 & 468A.050
History: DEQ 7-2015, f. & cert. ef. 4-16-15 DEQ 6-2001, f. 6-18-01, cert. ef. 7-1-01 DEQ 14-1999, f. & cert. ef. 10-14-99, Renumbered from 340-030-0320 DEQ 22-1996, f. & cert. 10-22-96 DEQ-10-1995, f. & cert. ef. 5-1-95
This rule cites
- This rule — target_record_not_published
- OAR 340-200-0040 — resolved
Cited by
Official source: https://secure.sos.state.or.us/oard/