OAR 340-073-0040: Drop Boxes
Edition: Current OARD snapshotEffective: 2026-01-01Last verified: 2026-09-07
(1) Drop boxes must be constructed of concrete, fiberglass, or other materials acceptable to DEQ . (2) Drop boxes must be constructed of durable, watertight materials resistant to deterioration and be designed to accommodate watertight connections for the effluent sewer and header pipes. The top, walls, and bottom of concrete drop boxes must be at least 1-1/2 inches thick. All drop boxes must be able to support an earth load of at least 200 pounds per square foot. (3) The inverts of the inlet and overflow port must be at the same elevation. The invert of the header pipe port(s) leading to the absorption trench(es) must be 6 inches below the inlet invert. (4) Drop box covers must be marked with the manufacturer's full business name or number assigned by DEQ. (5) Each manufacturer must provide DEQ with complete, detailed plans and specifications of the drop box and must certify, in writing, that drop boxes manufactured for use in onsite systems in Oregon will comply with all requirements of this rule. Plans and specifications must be prepared under the supervision of and designed by a professional engineer licensed in accordance with ORS Chapter 672.
Official history and status
Statutory/Other Authority: ORS 454.625 & 468.020
Statutes/Other Implemented: ORS 454.615
History: DEQ 29-2025, amend filed 10/01/2025, effective 01/01/2026 DEQ 11-2004, f. 12-22-04, cert. ef. 3-1-05 DEQ 27-1994, f. 11-15-94, cert. ef. 4-1-95 DEQ 10-1981, f. & ef. 3-20-81
This rule cites
- this rule — target_record_not_published
- ORS Chapter 672 — target_record_not_published
Cited by
Official source: https://secure.sos.state.or.us/oard/