OAR 333-106-0110: General Requirements: Plan Review
Edition: Current OARD snapshotEffective: 2008-09-15Last verified: 2026-09-07
When required by the Authority, and: (1) Prior to construction, the floor plans and equipment arrangement of all new installations, or modifications of existing installations, utilizing X-rays for diagnostic or therapeutic purposes must be submitted to the Authority for review and approval. The required information is as set out in division 120. (2) The Authority may require the applicant to utilize the services of a qualified expert to determine the shielding requirements prior to the plan review and approval. (3) The approval of such plans shall not preclude the requirement of additional modifications should a subsequent analysis of operating conditions indicate the possibility of an individual receiving a dose in excess of the limits prescribed in division 120.
Official history and status
Statutory/Other Authority: ORS 453.605 - 453.807
Statutes/Other Implemented: ORS 453.605 - 453.807
History: PH 14-2008, f. & cert. ef. 9-15-08 PH 12-2006, f. & cert. ef. 6-16-06 HD 15-1994, f. & cert. ef. 5-6-94 HD 1-1991, f. & cert. ef. 1-8-91
This rule cites
No citations extracted.
Cited by
Official source: https://secure.sos.state.or.us/oard/