OAR 330-135-0037: Eligible Woody Biomass Energy Technology Costs
Edition: Current OARD snapshotEffective: 2020-01-01Last verified: 2026-09-07
(1) For space or water heating, eligible costs include the cost of the boiler, associated piping, boiler controls, fuel storage bins, fuel delivery system from the storage tank, piping, heat exchangers, de-ashing equipment, pumps, metering, controls, labor, and commissioning. Costs for heat distribution systems, such as ductwork or radiant floors, or costs for backup systems that use conventional energy sources, do not qualify. (2) For combined heat and power systems, eligible costs include the costs listed in (1) above and costs for power generation equipment.
Official history and status
Statutory/Other Authority: ORS 469.040 & ORS 279C.528
Statutes/Other Implemented: ORS 279C.527 & ORS 279C.528
History: DOE 2-2019, adopt filed 12/19/2019, effective 01/01/2020
This rule cites
No citations extracted.
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/