OAR 123-046-0080: Tide Gate Planning Project Application Eligibility Criteria
Edition: Current OARD snapshotEffective: 2021-03-15Last verified: 2026-09-07
The Department will determine tide gate planning project application eligibility using criteria including but not limited to the following: (1) The application must demonstrate that the study scope will include all elements needed to develop a shovel ready tide gate project consistent with OAR 123-046-0060(1). (2) All required permits and regulatory authorizations must be addressed through the study scope. (3) The study scope must result in feasibility documentation consistent with OAR 123-046-0060(2). (4) The study scope must include a plan to communicate with all impacted landowners throughout the course of the planning project.
Official history and status
Statutory/Other Authority: ORS 285A.075 & Ch 10, OL 2020
Statutes/Other Implemented: Ch 10, OL 2020
History: OBDD 4-2021, adopt filed 03/15/2021, effective 03/15/2021 OBDD 21-2020, temporary adopt filed 10/05/2020, effective 10/05/2020 through 04/01/2021
This rule cites
- OAR 123-046-0060 — resolved
Cited by
No inbound citations found.
Official source: https://secure.sos.state.or.us/oard/